Results 1-10 of 14 (Search time: 0.005 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
MINIMIZING MEAN TARDINESS AND EARLINESS IN SINGLE-MACHINE SCHEDULING PROBLEMS WITH UNEQUAL DUE-DATES Kim, Yeong-Dae; YANO, CA, NAVAL RESEARCH LOGISTICS, v.41, no.7, pp.913 - 933, 1994-12 | |
Simple Enumeration of Minimal Cutsets Separating 2 Vertices in a Class of Undirected Planar Graphs Sung, Chang Sup, IEEE TRANSACTIONS ON RELIABILITY, v.41, no.1, pp.63 - 71, 1992-01 | |
Joint configuration of backbone and logical networks on a reconfigurable packet-switched network with unreliable links Lee, JH; Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.30, no.3, pp.309 - 331, 1998-04 | |
PARAMETRIC MAX-FLOW PROBLEMS IN A CLASS OF NETWORKS WITH SERIES-PARALLEL STRUCTURE Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.21, no.7, pp.769 - 776, 1994-01 | |
A HEURISTIC METHOD FOR SOLVING REDUNDANCY OPTIMIZATION PROBLEMS IN COMPLEX-SYSTEMS KIM, JH; Yum, Bong-Jin, IEEE TRANSACTIONS ON RELIABILITY, v.42, no.4, pp.572 - 578, 1993-12 | |
An integrated approach to dynamic plant location and capacity planning Lim, SK; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.12, pp.1205 - 1216, 1999-12 | |
Search heuristics for resource constrained project scheduling Lee, Jae-Kwan; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.47, no.5, pp.678 - 689, 1996-05 | |
HEURISTICS FOR FLOWSHOP SCHEDULING PROBLEMS MINIMIZING MEAN TARDINESS Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.1, pp.19 - 28, 1993-01 | |
Time slot assignment in a heterogeneous environment of a SS/TDMA system Kim, Sehun; Kim, S, INTERNATIONAL JOURNAL OF SATELLITE COMMUNICATIONS, v.15, no.5, pp.197 - 203, 1997 | |
A descent method with linear programming subproblems for nondifferentiable convex optimization Kim, Sehun; Chang, KN; Lee, JY, MATHEMATICAL PROGRAMMING, v.71, no.1, pp.17 - 28, 1995-11 |
Discover