Showing results 1 to 5 of 5
A heuristic algorithm for identical parallel machine scheduling: splitting jobs, sequence-dependent setup times, and limited setup operators Lee, Jun-Ho; Kim, Hyun-Jung, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, v.33, no.4, pp.992 - 1026, 2021-12 |
Bounds for parallel machine scheduling with predefined parts of jobs and setup time Kim, Hyunjung, ANNALS OF OPERATIONS RESEARCH, v.261, no.1-2, pp.401 - 412, 2018-02 |
Configuring Both Backbone and Logical Networks for a Reconfigurable Network with Link Failures Allowed Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.26, no.0, pp.227 - 249, 1996-04 |
Item Assignment Problem in a Robotic Mobile Fulfillment System Kim, Hyun-Jung; Pais, Cristobal; Shen, Zuo-Jun Max, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.17, no.4, pp.1854 - 1867, 2020-10 |
Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers Kim, Hyun-Jung; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.126, 2021-02 |
Discover