Showing results 1 to 7 of 7
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness Lee, GC; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4731 - 4743, 2004-11 |
A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system Lee, GC; Kim, Yeong-Dae; Kim, JG; Choi, SH, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.54, no.10, pp.1038 - 1049, 2003-10 |
Algorithms for adjusting shapes of departments in block layouts on the grid-based plane Lee, GC; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.28, no.1, pp.111 - 122, 2000-02 |
Bottleneck-focused scheduling for a hybrid flowshop Lee, GC; Kim, Yeong-Dae; Choi, SW, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.165 - 181, 2004-01 |
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop Choi, SW; Kim, Yeong-Dae; Lee, GC, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.43, pp.2149 - 2167, 2005-06 |
Tool requirements planning in a flexible manufacturing system with an automatic tool transporter Kim, Yeong-Dae; Lee, GC; Choi, SK; Lim, SK, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.6, pp.795 - 804, 2001-12 |
Toot requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint Kim, Yeong-Dae; Lee, GC; Lim, SK; Choi, SK, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.41, no.14, pp.3339 - 3357, 2003-09 |
Discover