Showing results 23 to 25 of 25
Tool requirements planning in a flexible manufacturing system with an automatic tool transporter Kim, Yeong-Dae; Lee, GC; Choi, SK; Lim, SK, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.6, pp.795 - 804, 2001-12 |
Toot requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint Kim, Yeong-Dae; Lee, GC; Lim, SK; Choi, SK, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.41, no.14, pp.3339 - 3357, 2003-09 |
Using workflow for reconfigurable simulation-based planning and scheduling system Lee, Ho-Yeoul; Choi, Byoung-Kyu, INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.24, no.2, pp.171 - 187, 2011-02 |
Discover