Browse "IE-Journal Papers(저널논문)" by Subject MANAGEMENT

Showing results 14 to 25 of 25

14
Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter

Jun, HB; Kim, YD; Suh, Hyo-Won, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.15, no.3, pp.488 - 496, 1999-06

15
LDEF Formalism for Agent-Based Model Development

Bae, Jang Won; Moon, Il-Chul, IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, v.46, no.6, pp.793 - 808, 2016-06

16
Lead time estimation method for complex product development process

Jun, Hong-Bae; Park, Jin-Young; Suh, Hyo-Won, CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, v.14, no.4, pp.313 - 328, 2006-12

17
Markov decision process model for patient admission decision at an emergency department under a surge demand

Lee, Hyun-Rok; Lee, Tae-Sik, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, v.30, no.1-2, pp.98 - 122, 2018-06

18
Mediator approach to direct workflow simulation

Lee, Duck Woong; Shin, Hayong; Choi, Byoung Kyu, SIMULATION MODELLING PRACTICE AND THEORY, v.18, no.5, pp.650 - 662, 2010-05

19
Optimal locations of switches and interconnections for ATM LANs

Choi, HS; Lee, H; Lee, KD; Kim, Sehun; Lee, JH, COMPUTERS OPERATIONS RESEARCH, v.28, no.13, pp.1347 - 1366, 2001-11

20
Optimal rate allocation and QoS-sensitive admission control in wireless integrated networks

Shin, Hyun M; Lee, Chae Young, WIRELESS NETWORKS, v.17, no.1, pp.231 - 246, 2011-01

21
Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter

Hwang, Hark, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.40, no.4, pp.873 - 883, 2002-01

22
Optimizing the Multistage University Admission Decision Process

Kim, Dong Hyun; Kim, Namyong; Cho, Junoh; Shin, Hayong, INFORMS Journal On Applied Analytics (INTERFACES), v.49, no.6, pp.422 - 429, 2019-11

23
Tool requirements planning in a flexible manufacturing system with an automatic tool transporter

Kim, Yeong-Dae; Lee, GC; Choi, SK; Lim, SK, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.6, pp.795 - 804, 2001-12

24
Toot requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint

Kim, Yeong-Dae; Lee, GC; Lim, SK; Choi, SK, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.41, no.14, pp.3339 - 3357, 2003-09

25
Using workflow for reconfigurable simulation-based planning and scheduling system

Lee, Ho-Yeoul; Choi, Byoung-Kyu, INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.24, no.2, pp.171 - 187, 2011-02

Discover

Type

Open Access

Date issued

. next

Subject

. next

rss_1.0 rss_2.0 atom_1.0