Showing results 4 to 7 of 7
Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility Kim, Yeong-Dae; Kim, JU; Lim, SK; Jun, HB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.11, no.1, pp.155 - 164, 1998-02 |
Plant location and procurement planning in knockdown production systems Lim, SK; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.52, no.3, pp.271 - 282, 2001-03 |
Tool requirements planning in a flexible manufacturing system with an automatic tool transporter Kim, Yeong-Dae; Lee, GC; Choi, SK; Lim, SK, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.6, pp.795 - 804, 2001-12 |
Toot requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint Kim, Yeong-Dae; Lee, GC; Lim, SK; Choi, SK, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.41, no.14, pp.3339 - 3357, 2003-09 |
Discover