Browse "IE-Journal Papers(저널논문)" by Type Article

Showing results 942 to 961 of 2083

942
Hark Kwang and Kim Dae Bum and Kim Yeong Dae

Hwang, Hark, I. J. OF PRODUCTION ECONOMICS, v.29, 1993-01

943
HCI에 관한 인지공학적 연구의 방향

윤완철, 한국데이터정보과학회지, v.9, no.5, pp.15 - 25, 1991-10

944
HDLSS Discrimination With Adaptive Data Piling

Lee, Myung Hee; Ahn, Jeongyoun; Jeon, Yongho, JOURNAL OF COMPUTATIONAL AND GRAPHICAL STATISTICS, v.22, no.2, pp.433 - 451, 2013-06

945
Head Tracking system Using Image Processing

C. Lim; Y. Ban; P. Chang; 박경수, 대한인간공학회지, v.16, no.3, pp.1 - 10, 1997-12

946
Heart Beat Interval Measurement Using an IBM PC

D. Lee; 박경수, 대한인간공학회지, v.9, no.1, 1990-06

947
HEURISTIC ALGORITHM FOR A MILITARY TRAINING TIMETABLING PROBLEM

Lee, S.Y.; Kim, Yeong-Dae; Lee, H.J., ASIA PACIFIC MANAGEMENT REVIEW, v.14, no.3, pp.289 - 299, 2009-09

948
HEURISTIC ALGORITHM FOR THE TOOL MOVEMENT POLICY IN FLEXIBLE MANUFACTURING SYSTEMS

Song, CY; Hwang, H; Kim, Yeong-Dae, JOURNAL OF MANUFACTURING SYSTEMS, v.14, no.3, pp.160 - 168, 1995

949
Heuristic algorithms for a multi-period multi-stop transportation planning problem

Kim, JU; Kim, Yeong-Dae; Shim, SO, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.53, no.9, pp.1027 - 1037, 2002-09

950
Heuristic Algorithms for a Single-Machine Common Due Date Assignment under Earliness/Tardiness Measure

Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.36, no.3, pp.121 - 133, 1993-04

951
Heuristic algorithms for assigning and scheduling flight missions in a military aviation unit

Kim, Bong-Kyun; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.61, no.4, pp.1309 - 1317, 2011-11

952
HEURISTIC APPROACHES FOR LOADING PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS

Kim, Yeong-Dae; Yano, CandaceArai, IIE TRANSACTIONS, v.25, no.1, pp.26 - 39, 1993-01

953
Heuristic for the assort-packing and distribution problem in the fashion apparel industry

Sung, Shin Woong; Jang, Young Jae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.56, no.9, pp.3116 - 3133, 2018-06

954
Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter

Jun, HB; Kim, YD; Suh, Hyo-Won, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.15, no.3, pp.488 - 496, 1999-06

955
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint

Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02

956
Heuristics for determining a patrol path of an unmanned combat vehicle

Park, Chul-Hwan; Kim, Yeong-Dae; Jeong, BongJoo, COMPUTERS & INDUSTRIAL ENGINEERING, v.63, no.1, pp.150 - 160, 2012-08

957
HEURISTICS FOR FLOWSHOP SCHEDULING PROBLEMS MINIMIZING MEAN TARDINESS

Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.1, pp.19 - 28, 1993-01

958
Heuristics for locating two types of public health-care facilities

Kim, Dong-Geun; Kim, Yeong-Dae; Lee, Taesik, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.11, no.2, pp.202 - 214, 2012-06

959
Heuristics for Scheduling Wafer Lots at the Deposition Workstation in a Semiconductor Wafer Fab

최성우; 임태규; 김영대, 대한산업공학회지, v.36, no.2, pp.125 - 137, 2010-06

960
Heuristics for search sequencing under time-dependent probabilities of existence

Lee, Ho-Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.34, no.7, pp.2010 - 2024, 2007-07

961
Heuristics for selecting machines and determining buffer capacities in assembly systems

Jeong, KC; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.38, no.3, pp.341 - 360, 2000-10

Discover

Type

Open Access

Date issued

. next

Subject

. next

rss_1.0 rss_2.0 atom_1.0