Showing results 1 to 8 of 8
A due-date-based algorithm for lot-order assignment in a semiconductor wafer fabrication facility Kim, Yeong-Dae; Bang, JY; An, KY; Lim, SK, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.21, pp.209 - 216, 2008-05 |
A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules Jeong, KC; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.9, pp.2609 - 2626, 1998-09 |
Adaptive inventory control models for supply chain management Kim, CO; Jun, J; Baek, JK; Smith, RL; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.26, pp.1184 - 1192, 2005-10 |
Capacity-filtering algorithms for finite-capacity planning of a flexible flow line Choi, Byoung Kyu; Seo, J. C., INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.47, no.12, pp.3363 - 3386, 2009 |
Maintenance of deteriorating single server queues with random shocks Yang, Won Seok; Lim, Dae Eun; Chae, Kyung-Chul, COMPUTERS & INDUSTRIAL ENGINEERING, v.57, no.4, pp.1404 - 1406, 2009-11 |
Maintenance of multi-state production systems deteriorated by random shocks and production Yang, Won Seok; Lim, Dae E.; Chae, Kyung-Chul, JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, v.20, no.1, pp.110 - 118, 2011-03 |
Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown Kim, Young-In; Kim, Hyun-Jung, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.59, no.17, pp.5236 - 5258, 2021-09 |
Transferring and sharing exchange-rate risk in a risk-averse supply chain of a multinational firm Kim, Kyoung-Kuk; Park, Kun Soo, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.237, no.2, pp.634 - 648, 2014-09 |
Discover