Showing results 1 to 3 of 3
An Analysis of Two-Stage manufacturing Systems with Random Processing Times 고시근; 황학, JOURNAL OF THE KOREAN OR/MS SOCIETY, v.22, no.1, pp.59 - 73, 1997-01 |
Production Switching Mechanism for an Unreliable Two-Stage Production Line 고시근; 황학, J. OF THE KOREAN INSTITUTE OF INDUSTRIAL ENGINEERS, v.24, no.1, pp.105 - 113, 1998-01 |
고장이 있는 두 단계 생산라인의 생산률 변환정책 고시근; 황학, 대한산업공학회지(JOURNAL OF THE KOREAN INSTITUTE OF INDUSTRIAL ENGINEERS), v.24, no.1, pp.105 - 113, 1998-03 |
Discover