Showing results 1121 to 1140 of 2094
Markov decision process model for patient admission decision at an emergency department under a surge demand Lee, Hyun-Rok; Lee, Tae-Sik, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, v.30, no.1-2, pp.98 - 122, 2018-06 |
Matrix representation for NURB curves and surfaces Choi, Byoung Kyu; Yoo, W.S.; Lee, C.S., COMPUTER-AIDED DESIGN, v.22, no.4, pp.235 - 240, 1990-05 |
Maximization of carried traffic by prioritizing new call attempts in a CDMA base station with finite receiver processors Kim, I; Kim, D; Kim, Sehun, IEICE TRANSACTIONS ON COMMUNICATIONS, v.E89B, pp.1879 - 1882, 2006-06 |
Maximizing MapReduce job speed and reliability in the mobile cloud by optimizing task allocation Lee, Jin-woo; Jang, Gwangseon; Jung, Hohyun; Lee, Jae-Gil; Lee, Uichin, PERVASIVE AND MOBILE COMPUTING, v.60, 2019-11 |
Maximizing total job value on a single machine with job selection Eun, Joonyup; Sung, Chang Sup; Kim, Eun-Seok, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.68, no.9, pp.998 - 1005, 2017-09 |
MDP에 의한 컬링 전략 선정 김동현; 배기욱; 박동현; 신하용, 대한산업공학회지, v.42, no.1, pp.65 - 72, 2016-02 |
Mean-Variance Optimization for Asset Allocation Kim, Jang Ho; Lee, Yongjae; Kim, Woo Chang; Fabozzi, Frank J., JOURNAL OF PORTFOLIO MANAGEMENT, v.47, no.5, pp.24 - 40, 2021-05 |
Measurement of R-R Intervals with a Microprocessor D.Lee; Kyung Soo Park, 대한인간공학회지, v.4, no.2, 1985-12 |
Measurement of Workload by Cardiac Arrhythmia 박경수, 대한인간공학회지, v.2, no.2, 1983-12 |
Mediator approach to direct workflow simulation Lee, Duck Woong; Shin, Hayong; Choi, Byoung Kyu, SIMULATION MODELLING PRACTICE AND THEORY, v.18, no.5, pp.650 - 662, 2010-05 |
Medical waste collection considering transportation and storage risk Taslimi, Masoumeh; Batta, Rajan; Kwon, Changhyun, COMPUTERS & OPERATIONS RESEARCH, v.120, 2020-08 |
Memory-Augmented Convolutional Neural Networks With Triplet Loss for Imbalanced Wafer Defect Pattern Classification Hyun, Yunseung; Kim, Heeyoung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.33, no.4, pp.622 - 634, 2020-11 |
MES (manufacturing execution system) architecture for FMS compatible to ERP (enterprise planning system) Choi, Byoung Kyu; Kim, BH, INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.15, no.3, pp.274 - 284, 2002 |
Message-passing architecture and its construction in object-oriented rapid modeling for automated manufacturing system simulation Hwang, MH; Choi, Byoung Kyu, SIMULATION, v.72, no.2, pp.90 - 104, 1999-02 |
MILLING PARAMETER OPTIMIZATION THROUGH A DISCRETE VARIABLE TRANSFORMATION CHANG, TC; WYSK, RA; DAVIS, RP; Choi, Byoung Kyu, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.20, no.4, pp.507 - 516, 1982 |
Mimixizing Makespan on a Single Burn-In Oven with Job Families and Dynamic Job Arrivals Allowed Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.29, no.8, pp.995 - 1007, 2002-07 |
Minimax Approach for Logical Configuration in Reconfigurable Virtual Circuit Data Network Sung, Chang Sup; park, s.k., IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, v.E78A, no.8, pp.1029 - 1033, 1995-08 |
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05 |
Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed Lee, Ik Sun; Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.186, no.3, pp.931 - 952, 2008-05 |
Minimizing Due Date Related Peformance Measures on Two Batch Processing Machines Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.147, no.3, pp.644 - 656, 2003-06 |
Discover