Showing results 2 to 3 of 3
Production Switching Mechanism for an Unreliable Two-Stage Production Line 고시근; 황학, J. OF THE KOREAN INSTITUTE OF INDUSTRIAL ENGINEERS, v.24, no.1, pp.105 - 113, 1998-01 |
고장이 있는 두 단계 생산라인의 생산률 변환정책 고시근; 황학, 대한산업공학회지(JOURNAL OF THE KOREAN INSTITUTE OF INDUSTRIAL ENGINEERS), v.24, no.1, pp.105 - 113, 1998-03 |
Discover