Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 21-30 of 32 (Search time: 0.005 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
21
Analysis of Discrete Event Systems with Bounded Random Time Variation

Kim, J.; Lee, Tae-Eogresearcher, 대한산업공학회/한국경영과학회 춘계공동학술대회, pp.923 - 929, 대한산업공학회/한국경영과학회, 2002

22
Due-date oriented scheduling rules for semiconductor assembly and test operation

Low, Malcolm Y. H.; Lee, Tae-Eog; Kim, Yeong-Daeresearcher, Asia-Pacific Management Conference, pp.1043 - 1056, 2004

23
A review of scheduling theory and methods for semiconductor manufacturing cluster tools

Lee, Tae-Eogresearcher, 2008 Winter Simulation Conference, WSC 2008, pp.2127 - 2135, 2008-12-07

24
Optimal scheduling of dual-armed cluster tools without swap restriction

Paek, J.-H.; Lee, Tae-Eogresearcher, 4th IEEE Conference on Automation Science and Engineering, CASE 2008, pp.103 - 108, 2008-08-23

25
Efficient scheduling method based on an assignment model for robotized cluster tools

Jung, Chihyun; Lee, Tae-Eogresearcher, 4th IEEE Conference on Automation Science and Engineering, CASE 2008, pp.79 - 84, 2008-08-23

26
An Efficient Scheduling Method Based on an Assignment Model for Robotized Cluster Tools

Jung, Chihyun; Lee, Tae-Eogresearcher, IEEE 2008 International Conference on Automation Science and Engineering, pp.79 - 84, 2008-08-25

27
A Genetic Algorithm for Feeder Arrangement of a Multi-Head Dual-Gantry Chip Mounter

Lee, Tae-Eogresearcher; Sun, D.; Kim, K., 첨단생산시스템 Workshop, pp.1 - 6, 2001

28
An integrated application framework for a cluster tool controller for semiconductor manufacturing

Lee, Tae-Eogresearcher; Lee, J.-H., 8th International Conference on Emerging Technologies and Factory Automation (ETFA 2001), v.2, pp.775 - 778, 2001-10-15

29
Integration of lot dispatching and AMHS control in a 300mm wafer FAB

Sun, D.-S.; Park, N.-S.; Lee, Y.-J.; Jang, Y.-C.; Ahn, C.-S.; Lee, Tae-Eogresearcher, 2005 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop - Advancing Semiconductor Manufacturing Excellence, pp.270 - 274, IEEE/SEMI, 2005-04-11

30
Schedule stabilization and robust timing control for time-constrained cluster tools

Kim, J.-H.; Lee, Tae-Eogresearcher, 2003 IEEE International Conference on Robotics and Automation, v.1, pp.1039 - 1044, IEEE, 2003-09-14

rss_1.0 rss_2.0 atom_1.0