Results 21-30 of 32 (Search time: 0.006 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Due-date oriented scheduling rules for semiconductor assembly and test operation Low, Malcolm Y. H.; Lee, Tae-Eog; Kim, Yeong-Dae, Asia-Pacific Management Conference, pp.1043 - 1056, 2004 | |
Optimal scheduling of dual-armed cluster tools without swap restriction Paek, J.-H.; Lee, Tae-Eog, 4th IEEE Conference on Automation Science and Engineering, CASE 2008, pp.103 - 108, 2008-08-23 | |
An Efficient Scheduling Method Based on an Assignment Model for Robotized Cluster Tools Jung, Chihyun; Lee, Tae-Eog, IEEE 2008 International Conference on Automation Science and Engineering, pp.79 - 84, 2008-08-25 | |
A Genetic Algorithm for Feeder Arrangement of a Multi-Head Dual-Gantry Chip Mounter Lee, Tae-Eog; Sun, D.; Kim, K., 첨단생산시스템 Workshop, pp.1 - 6, 2001 | |
Integration of lot dispatching and AMHS control in a 300mm wafer FAB Sun, D.-S.; Park, N.-S.; Lee, Y.-J.; Jang, Y.-C.; Ahn, C.-S.; Lee, Tae-Eog, 2005 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop - Advancing Semiconductor Manufacturing Excellence, pp.270 - 274, IEEE/SEMI, 2005-04-11 | |
Scheduling a multi-chip package assembly line with reentrant processes and unrelated parallel machines Lee, S.-J.; Lee, Tae-Eog, 2008 Winter Simulation Conference, WSC 2008, pp.2286 - 2291, WSC '08, 2008-12-07 | |
Efficient scheduling method based on an assignment model for robotized cluster tools Jung, Chihyun; Lee, Tae-Eog, 4th IEEE Conference on Automation Science and Engineering, CASE 2008, pp.79 - 84, 123, 2008-08-23 | |
A review of scheduling theory and methods for semiconductor manufacturing cluster tools Lee, Tae-Eog, 2008 Winter Simulation Conference, WSC 2008, pp.2127 - 2135, 123, 2008-12-07 | |
Token delays and generalized workload balancing for timed event graphs with application to cluster tool operation Lee, Tae-Eog; Lee, H.-Y.; Sreenivas, R.S., 2006 IEEE International Conference on Automation Science and Engineering, CASE, pp.93 - 99, 123, 2006-10-08 | |
Schedule stabilization and robust timing control for time-constrained cluster tools Kim, J.-H.; Lee, Tae-Eog, 2003 IEEE International Conference on Robotics and Automation, pp.1039 - 1044, IEEE, 2003-09-14 |