91 | Cell formation using adherence coefficient for group technology Hwang Hark, , 1998-01-01 |
92 | An Optimal Lot Sizing Model under the Condition of Multi-Step Permissible Delay in Payments Hwang, Hark, , 1996-01-01 |
93 | A Micro Approach in Science and Engineering Manpower Forecasting : An Experience in Korea Sung, Chang Sup, pp.32 - 41, 1983-04-01 |
94 | Lot Streaming in a Multi-Stage Flow Shop with Batch Setup Times Sung, Chang Sup, pp.0 - 0, 1993-04-01 |
95 | A Tow Machine Flow Shop Scheduling Problem with the N-Step-prior-job Dependent Setup Times Hwang, Hark, The 14th International Conference on Production Research, pp.466 - 469, 1997 |
96 | A rule based dispatching algorithm for automated guided vehicles with multiple-load capacity Hwang, Hark, , 1998-01-01 |
97 | Production Sequencing Problem with Reentrant Work Flows and Sequence Dependent Setup Times Hwang, Hark, , 1996-01-01 |
98 | Expected service time model for a rotary parking system Hwang, Hark, , 1997-01-01 |
99 | Allocating Base Stations in a DCS-Incorporated Mobile Radio Network Sung, Chang Sup, INFORMS National Meeting, 1995 |
100 | A Branch-and-Cut Algorithm for the Generalized Communication Tree Network Design Kyungsik Lee; Kyungchul Park; Park, Sungsoo, Math. Prog. Society, pp.125 - 126, 1994 |