Results 111-120 of 1884 (Search time: 0.005 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Development of a Shipyard Basic Planning System Park, J.; Ok, C.; Lee, Tae-Eog; Baek, T.; Jung, D.; Lee, G., 대한산업공학회 추계학술대회, pp.707 - 707, 대한산업공학회, 1994-09 | |
On the Stochastic Knapsack Value Function for Random Items of Multiple Classes Lee, Tae-Eog, 한국경영과학회/대한산업공학회 춘계공동학술대회 , pp.230 - 230, 한국경영과학회/대한산업공학회, 1993-04 | |
An Object-Oriented Simulation Engine based on Process Interaction Lee, J.; Lee, Tae-Eog, 대한산업공학회 추계학술대회 , pp.242 - 242, 대한산업공학회, 1994-09 | |
A generative approach for die pattern matchining Shin, Hayong; Treccapelli, Robert M.; Jr. Andrew Shudra; Chung, Yun C., IFIP, pp.24 - 31, 1998 | |
Balancing Assembly Line in an Electronics Company 박경철; 강석훈; 박성수; 김완희, 한국경영과학회 추계학술대회, pp.12 - 19, 1993-10 | |
Optimum Ramp Tests for Exponential Distributions under Stress and Time Censoring 배도선, '92 국내외 한국과학기술자 학술회의 하계 Symposium 논문집, pp.192 - 198, 1992 | |
Protrusion and depression generation for concurrent engineering Suh, Hyo-Won; Ahluwalia, R.S; Miller, James E., Journal of Design and Manufacturing, pp.159 - 166, 1993 | |
Analysis of the Prediction problem in Linear Regression When the Independent Variables are Measured with Error Byun, JH; Yum, Bong-Jin, 대한산업공학회/한국경영과학회 춘계 공동학술대회 논문집, pp.245 - 253, 1990 | |
지수 수명분포하에서 신뢰도 합격 판정 샘플링 계획의 비교 염봉진; 정현석, 92 국내외 한국과학기술자 하계 심포지움, pp.189 - 191, 한국과학기술단체, 1992 | |
A two machine flow shop scheduling problem with the N-step-prior-job dependent setup times Hwang, Hark, The 14-th International Conference on Production Research, 1997-01-01 |
Discover