Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 101-110 of 1887 (Search time: 0.006 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
101
Solving a GT Cell Formation Problem Based on Material Flow

이동준; 박성수, 대한산업공학회/한국경영과학회 춘계공동학술대회478, 대한산업공학회/한국경영과학회, 1994

102
Lifting Procedures for the Precedence Constrained Knapsack Problem

Park, Kyungchul; Park, Sungsoo, Math. Prog. Society, pp.1 - 161, 1994

103
객체지향생산관리 시스템의 설계

서효원; 차상균; 전용준; 박장호, 한국정보과학회 '94 가을학술발표논문집(A), pp.261 - 264, 한국정보과학회, 1994

104
Side Frame 생산공정의 생산계획, 일정계획 및 Slit 판재 입고계획 수립을 위한 시스템 구축

Hwang Hark, , 1996-01-01

105
An optimal configuration of double carousel system with two-class based turnover assignment policy

Hwang Hark, , 1997-01-01

106
SA-based hybrid heuristic for vehicle routing problem with time deadlines

Hwang Hark, , 1998-01-01

107
Mathematical Analysis of the Reliability of a Modem Electronic Protective Device for Production Machinery

Choi, Byoung Kyu; Barash, M; Etherton, J, Proc. of the 7thInternation Conference of Production Research, pp.22 - 24, 1983-08

108
차체 판넬금형의 NC 가공상의 문제점 및 해결방안

최병규, 대한산업공학회 '92 추계학술발표대회, 대한산업공학회, 1992-10

109
Modular Approach to Petri-Net Modeling of FAS

박태유; 최병규, 92년도 춘계공동학술대회 , 대한산업공학회, 1992-05

110
A Study on Scheduling Algorithms for Shipbuilding Industry

Lim, J.; Song, J.; Lee, Tae-Eog, 대한산업공학회/한국경영과학회 춘계공동학술대회, pp.649 - 649, 대한산업공학회/한국경영과학회, 1994-04

rss_1.0 rss_2.0 atom_1.0