Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 61-70 of 118 (Search time: 0.008 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
61
Workload Balancing and Scheduling of a Single-Armed Cluster Tool

Lee, Tae-Eog; Lee, Hwan-Yong; Shin, Yong-Ho, APIEMS, pp.1 - 6, 2004-12-01

62
Analysis of Discrete Event Systems with Bounded Random Time Variation

Kim, J.; Lee, Tae-Eog, 대한산업공학회/한국경영과학회 춘계공동학술대회, pp.923 - 929, 대한산업공학회/한국경영과학회, 2002

63
Scheduling of Petri nets as a multi-objective shortest path problem

Wikborg, Uno; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22

64
Due-date oriented scheduling rules for semiconductor assembly and test operation

Low, Malcolm Y. H.; Lee, Tae-Eog; Kim, Yeong-Dae, Asia-Pacific Management Conference, pp.1043 - 1056, 2004

65
Optimal scheduling of dual-armed cluster tools without swap restriction

Paek, J.-H.; Lee, Tae-Eog, 4th IEEE Conference on Automation Science and Engineering, CASE 2008, pp.103 - 108, 2008-08-23

66
Scheduling in-line multiple cluster tools: A decomposition approach

Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho; Kim, Chulhan; Baik, Sun-Hee, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08

67
Performance and Schedules Patterns of Periodic Job Shops

Lee, Tae-Eog; Posner, Marc E., 한국경영과학회/대한산업공학회 춘계공동학술대회, pp.557 - 557, 한국경영과학회/대한산업공학회, 1992-04

68
Performance and Schedules Patterns of Periodic Job Shops

Lee, Tae-Eog; Posner, Marc E., ORSA/TIMS Joint National Meeting, 1991-09

69
Stable Earliest Starting Schedules for Periodic Job Shops: a Linear System Approach

Lee, Tae-Eog, 한국경영과학회 추계학술대회, pp.118 - 118, 한국경영과학회, 1993-09

70
Stable Earliest Starting Schedules of Periodic Job Shops: a Linear System Approach

Lee, Tae-Eog, The 11th International Conference on Analysis and Optimization of Systems, pp.290 - 296, 1994-06

rss_1.0 rss_2.0 atom_1.0