Results 51-60 of 118 (Search time: 0.011 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
A Virtual Cluster Tool for Cluster Tool Controller and Scheduler Development Joo, Yong-Jae; Lee, Tae-Eog, MASM, pp.1 - 6, 2001-05 | |
An open scheduling architecture for cluster tools Lee , Jun-Ho; Lee, Tae-Eog, 2010 IEEE International Conference on Automation Science and Engineering, CASE 2010, pp.420 - 425, IEEE, 2010-08-21 | |
Petri Net Modeling and Scheduling of Periodic Shops with Blocking Song, Ju-Seok; Lee, Tae-Eog, 대한산업공학회/한국경영과학회 춘계공동학술대회, pp.314 - 314, 대한산업공학회/한국경영과학회, 1996-04 | |
Petri Net Modeling and Scheduling of Periodic Job Shops with Blocking Lee, Tae-Eog; Song, Ju-Seok, The 1st Workshop on Manufacturing and Petri Nets, pp.197 - 214, 1996-06 | |
Two-Level Hybrid Modeling Method for Performance Modeling of Large Public ATM Networks Lee, Tae-Eog; Park, S.; Jin, H.; Sun, D.; Jun, H., 한국경영과학회/대한산업공학회 99춘계공동학술대회, pp.391 - 395, 한국경영과학회/대한산업공학회, 1999-05 | |
Scheduling and Determination of Feasible Process Times for Cluster Tools with Dual End Effector Lee, H.; Lee, Tae-Eog, 한국경영과학회/대한산업공학회 춘계공동학술대회, pp.1 - 4, 2000-04 | |
Modeling and Scheduling of Cyclic Shops with Time Window Constraints Seo, J.; Lee, Tae-Eog, 한국경영과학회, pp.161 - 164, 한국경영과학회, 2000-10 | |
A Transient State Analysis of Dual-Armed Cluster-tools with Wafer Delay Constraints Kim, Tae-Kyu; Lee, Tae-Eog, MASM, pp.1 - 6, 2005-10-01 | |
Scheduling a Time-Constrained Wet Station with Multiple Job Flows and Multiple Wafer Handling Robots Lee, Hwan-Yong; Lee, Tae-Eog, MASM, pp.1 - 6, 2005-10-01 | |
Batching and Input Regulation in the Photolithography Process for Memory Chips Fabrication Shin, Y.; Lee, Tae-Eog; Lee, Y., 한국경영과학회 1995년도 춘계공동학술대회, pp.750 - 750, 한국경영과학회, 1995-04 |
Discover