Showing results 1 to 4 of 4
HEURISTICS FOR A TWO-STAGE HYBRID FLOWSHOP SCHEDULINGPROBLEM WITH INCOMPATIBLE JOB FAMILIES Joo, Byung-Jun; Kim, Yeong-Dae, Asia Pacific Industrial Engineering and Management Systems Conference, pp.31.15.1 - 31.15.7, 2004 |
Heuristics for scheduling jobs with distinct ready times on a two-stage hybrid flowhop scheduling problem with a product-mix ratio constraint Joo, Byung-Jun; Shin, Jong-Ho; Kim, Yeong-Dae, Asia-Pacific Management Conference, pp.965 - 978, 2004 |
Scheduling two-machine flowshop with limited waiting time to minimize makespan Joo, Byung-Jun; Kim, Yeong-Dae, International Conference on Computers and Industrial Engineering, pp.CIE561 - CIE561, 2004 |
Scheduling wafer lots on diffusion machines in a semiconductor wafer fabrication facility Choi, So-Young; Joo, Byung-Jun; Kim, Yeong-Dae, International Conference on Modeling and Analysis of Semiconductor Manufacturing, pp.28 - 33, 2005 |
Discover