Showing results 1241 to 1260 of 1890
Scheduling for the Photolithography Process in Semiconductor Manufacturing Chang Sup Sung, pp.0 - 0, 1996-04-01 |
Scheduling in-line multiple cluster tools: A decomposition approach Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho; Kim, Chulhan; Baik, Sun-Hee, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08 |
Scheduling Jobs in a Combined Production-Delivery Supply Chain 성창섭, 한국SCM, 2004 |
Scheduling jobs with stochastic holding costs Lee, Dabeen; Vojnovic, Milan, 35th Conference on Neural Information Processing Systems, NeurIPS 2021, pp.19375 - 19384, The Neural Information Processing Systems Foundation, 2021-12-06 |
Scheduling of a dual-armed cluster tool with two independent robot arms Tonke, Daniel; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22 |
Scheduling of a Flow Shop without Intermediate Queues but with Job Holders Required for Processing Sung, Chang Sup, pp.0 - 0, 1993-04-01 |
Scheduling of Cluster Tools with Complex Scheduling Requirements Yu, Tae Sun; Lee, Tae-Eog, 20th Conference of the International Federation of Operational Research Societies, IFORS, 2014-07-15 |
Scheduling of cluster tools with ready time constraints for small lot production Lee, Tae-Eog; Kim, Hyun-Jung, IEEE 2011 International Conference on Automation Science and Engineering, pp.96 - 101, IEEE, 2011-08-25 |
Scheduling of Dual-armed Cluster Tools with 2-cyclic Chamber Cleaning Operations 이태경; 이태억, 2018춘계공동학술대회, 대한산업공학회, 2018-04-05 |
Scheduling of Dual-armed Cluster Tools with k-periodic Chamber Cleaning LEE, TAE GYUNG; Lee, Tae-Eog, 2018 대한산업공학회 추계학술대회, pp.747 - 777, 대한산업공학회, 2018-11-09 |
Scheduling of Dual-Armed Cluster Tools with Time Constraints Kim, Ja-Hee; Lee, Tae-Eog; Lee, Hwan-Yong, MASM, pp.1 - 6, 2002-04 |
Scheduling of Petri nets as a multi-objective shortest path problem Wikborg, Uno; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22 |
Scheduling of Shipyard Block Assembly Process using Constraint Satisfaction Problem 김희문; 강장하; 박성수, 한국경영과학회/대한산업공학회 춘계공동학술대회, pp.697 - 703, 2002 |
Scheduling of Three-Operation Jobs in a Two-Machine Flow Shop with Mean Flow Time Measure 성창섭, 한국경영과학회, 2006 |
Scheduling pressing processes of battery manufacturing with a genetic algorithm Park, Sang-Su; Lee, Sangwook; Kim, Hyunjung, IEEE International Conference on Automation Science and Engineering, IEEE Robotics and Automation Society, 2020-08-21 |
Scheduling Time-Constrained Cyclic Manufacturing Systems: Linear Programming and Directed Graph Models Lee, Tae-Eog; Shin, Yong-Ho, APIEMS, pp.1 - 5, 2002-12 |
Scheduling timed Petri nets with a time-feasible reachability tree Kim, Hyun-Jung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE Conference on Networking, Sensing, and Control, pp.94 - 99, IEEE Systems, Man, and Cybernetics Society, 2013-04-10 |
Scheduling transient periods of dual-armed cluster tools Lee, Tae-Eog; Lee, Jun-Ho; Kim, Hyun-Jung, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08 |
Scheduling Transient Periods of Single-Armed Cluster Tools Lee, Jun-Ho; Lee, Tae-Eog, IEEE 2012 International Conference on Robotics and Automation, pp.5062 - 5067, IEEE, 2012-05-17 |
Scheduling two-machine flowshop with limited waiting time to minimize makespan Joo, Byung-Jun; Kim, Yeong-Dae, International Conference on Computers and Industrial Engineering, pp.CIE561 - CIE561, 2004 |
Discover