Sequential lagrangean decomposition for material requirements planning with bottleneck capacities공동설비제약하에서의 자재소요계획

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 428
  • Download : 0
This thesis presents a heuristic algorithm for multi-item multi-level dynamic lot sizing problem under multiple bottleneck facilities. The problem is formulated as a mixed integer programming model. Subproblems for each item is obtained by taking Lagrangean Relaxation at each stage through bill of material sequence. Each subproblem considers the rest of the system like a master problem. And marginal analysis is used for updating multipliers. And solution procedure is presented. Finally, computational results and suggestions for further study are presented.
Advisors
Ahn, Byung-Hunresearcher안병훈researcher
Description
한국과학기술원 : 경영과학과,
Publisher
한국과학기술원
Issue Date
1986
Identifier
65387/325007 / 000841367
Language
eng
Description

학위논문(석사) - 한국과학기술원 : 경영과학과, 1986.2, [ [ii], 52 p. ]

URI
http://hdl.handle.net/10203/44740
Link
http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=65387&flag=dissertation
Appears in Collection
MG-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0