Due-date based loading and scheduling methods in a flexible manufacturing system with an automatic tool transporter공구이송이 가능한 유연제조시스템에서 납기를 고려한 부품과 공구 할당 및 일정 계획에 관한 연구

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 591
  • Download : 0
DC FieldValueLanguage
dc.contributor.advisorKim, Yeoung-Dea-
dc.contributor.advisor김영대-
dc.contributor.authorRoh, Hwan-Kyun-
dc.contributor.author노환균-
dc.date.accessioned2011-12-14T04:19:04Z-
dc.date.available2011-12-14T04:19:04Z-
dc.date.issued1996-
dc.identifier.urihttp://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=105294&flag=dissertation-
dc.identifier.urihttp://hdl.handle.net/10203/41471-
dc.description학위논문(석사) - 한국과학기술원 : 산업공학과, 1996.2, [ v, 40 p. ]-
dc.description.abstractIn this thesis, we consider loading and scheduling problems in a flexible manufacturing system (FMS) in which each part visits only one machine for its entire processing. In this type of FMSs, if tools are not loaded on the tool magazine of the machine for a part assigned to it, they can be transferred from other machines or a tool crib. For an efficient operation of such systems, loading and scheduling of parts and tools should be done carefully. We consider problems of part loading, tool loading, and part sequencing with the objective of minimizing the total tardiness although most of previous research on these problems has focused on maximizing throughput. In this paper, we suggest three heuristic approaches, called list scheduling, sequential, and iterative approaches. List scheduling approach determines loading and schedule of parts and tools simultaneously according to part priorities. In the sequential approach, we solve the parallel machine scheduling problem to determine loading and sequence of parts and then tool loading problem is solved by a heuristic using estimate of tardiness improvement for each tool. The iterative approach solves the part loading and sequencing problem and tool loading problem iteratively using solution of the other problem. Results of computational test on randomly generated problems show that the iterative approach performs better than the others.eng
dc.languageeng-
dc.publisher한국과학기술원-
dc.subjectloading and scheduling-
dc.subjectAutomatic tool transfer-
dc.subjectFMS-
dc.subjectdue date-
dc.subject납기-
dc.subject공구할당 및 일정계획-
dc.subject공구자동이송-
dc.subject유연제조시스템-
dc.titleDue-date based loading and scheduling methods in a flexible manufacturing system with an automatic tool transporter-
dc.title.alternative공구이송이 가능한 유연제조시스템에서 납기를 고려한 부품과 공구 할당 및 일정 계획에 관한 연구-
dc.typeThesis(Master)-
dc.identifier.CNRN105294/325007-
dc.description.department한국과학기술원 : 산업공학과, -
dc.identifier.uid000943170-
dc.contributor.localauthorKim, Yeoung-Dea-
dc.contributor.localauthor김영대-
Appears in Collection
IE-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0