DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Sung, Chang-Sup | - |
dc.contributor.advisor | 성창섭 | - |
dc.contributor.author | Choung, You-In | - |
dc.contributor.author | 정유인 | - |
dc.date.accessioned | 2011-12-14T04:18:34Z | - |
dc.date.available | 2011-12-14T04:18:34Z | - |
dc.date.issued | 1994 | - |
dc.identifier.uri | http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=69480&flag=dissertation | - |
dc.identifier.uri | http://hdl.handle.net/10203/41437 | - |
dc.description | 학위논문(석사) - 한국과학기술원 : 산업공학과, 1994.2, [ ii, 45 p. ] | - |
dc.description.abstract | This thesis considers a single machine scheduling problem where each job produces not only its own main product but also a common type of by-product. Two different cases are investicated in consideration with distint time mechanisms of producing the common by-product. One of them is concerned with the situation where each job produces the by-product at job completion time, and the other one is concerned with the situation where each job produces the by-product continuously during processing of that job. Two performance measures are considered including weighted tardiness and weighted flow time. Both cases are shown to be NP-complete, and some dominance solution properties are characterized and used to derive a heuristic solution algorithm. The algorithm is tested for its effectiveness with several numerical problems. | eng |
dc.language | eng | - |
dc.publisher | 한국과학기술원 | - |
dc.title | (A) single machine scheduling problem with a by-product | - |
dc.title.alternative | 부산물이 발생하는 작업들의 단일설비 일정계획 | - |
dc.type | Thesis(Master) | - |
dc.identifier.CNRN | 69480/325007 | - |
dc.description.department | 한국과학기술원 : 산업공학과, | - |
dc.identifier.uid | 000923462 | - |
dc.contributor.localauthor | Sung, Chang-Sup | - |
dc.contributor.localauthor | 성창섭 | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.