DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Hwang, Hark | - |
dc.contributor.advisor | 황학 | - |
dc.contributor.author | Lim, Joon-Moog | - |
dc.contributor.author | 임준묵 | - |
dc.date.accessioned | 2011-12-14T04:17:06Z | - |
dc.date.available | 2011-12-14T04:17:06Z | - |
dc.date.issued | 1990 | - |
dc.identifier.uri | http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=67417&flag=dissertation | - |
dc.identifier.uri | http://hdl.handle.net/10203/41336 | - |
dc.description | 학위논문(석사) - 한국과학기술원 : 산업공학과, 1990.2, [ [ii], 55 p. ] | - |
dc.description.abstract | This thesis deals with a scheduling problem of double hoist operation systems in chemical processes. For the model developed, a procedure is proposed which finds a maximum throughput cyclic schedule. It is enumerative in nature and utilizes the solution of Mixed Integer Programming(MIP). Additionally, alternative configurations of the hoist system are considered such as multiple tanks of a same type and the loading tank being identical with the unloading tank. Real world problems are solved to show the validity of the models. | eng |
dc.language | eng | - |
dc.publisher | 한국과학기술원 | - |
dc.title | Double hoist scheduling in the chemical processes | - |
dc.title.alternative | 화학공정상의 두대의 호이스트 운용 방안에 관한 연구 | - |
dc.type | Thesis(Master) | - |
dc.identifier.CNRN | 67417/325007 | - |
dc.description.department | 한국과학기술원 : 산업공학과, | - |
dc.identifier.uid | 000881400 | - |
dc.contributor.localauthor | Hwang, Hark | - |
dc.contributor.localauthor | 황학 | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.