DC Field | Value | Language |
---|---|---|
dc.contributor.author | Hossen, Muhammed Mufazzal | ko |
dc.contributor.author | Kang, Sunkoo | ko |
dc.contributor.author | Jung, JC | ko |
dc.contributor.author | Kim, Jonghyun | ko |
dc.date.accessioned | 2024-03-07T01:00:11Z | - |
dc.date.available | 2024-03-07T01:00:11Z | - |
dc.date.created | 2024-03-07 | - |
dc.date.created | 2024-03-07 | - |
dc.date.created | 2024-03-07 | - |
dc.date.issued | 2015 | - |
dc.identifier.citation | Journal of the Korea Society of Systems Engineering, v.11, no.1, pp.9 - 24 | - |
dc.identifier.issn | 1738-480X | - |
dc.identifier.uri | http://hdl.handle.net/10203/318446 | - |
dc.description.abstract | Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods. | - |
dc.language | English | - |
dc.publisher | The Korean Society of Systems Engineering | - |
dc.title | Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach | - |
dc.type | Article | - |
dc.type.rims | ART | - |
dc.citation.volume | 11 | - |
dc.citation.issue | 1 | - |
dc.citation.beginningpage | 9 | - |
dc.citation.endingpage | 24 | - |
dc.citation.publicationname | Journal of the Korea Society of Systems Engineering | - |
dc.identifier.doi | 10.14248/jkosse.2015.11.1.009 | - |
dc.contributor.localauthor | Kim, Jonghyun | - |
dc.contributor.nonIdAuthor | Hossen, Muhammed Mufazzal | - |
dc.contributor.nonIdAuthor | Kang, Sunkoo | - |
dc.contributor.nonIdAuthor | Jung, JC | - |
dc.description.isOpenAccess | N | - |
dc.type.journalArticle | Article | - |
dc.subject.keywordPlus | Need analysis | - |
dc.subject.keywordPlus | Concept exploration | - |
dc.subject.keywordPlus | Concept definition | - |
dc.subject.keywordPlus | Systems engineering | - |
dc.subject.keywordPlus | Schedule Delay Risk | - |
dc.subject.keywordPlus | NPP | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.