(A) reinforcement learning approach to lot size scheduling강화학습 방법론을 적용한 로트 사이즈 스케줄링

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 186
  • Download : 0
In this paper, we study a lot size scheduling problem similar to the actual factory size. In fact, building process and curing process are important processes that determine product types and produce finished products in tire factories. The curing processing is less variable in scheduling and is expensive due to idle time because it maintains energy even in the absence of production. Therefore, lot size scheduling is carried out to prevent idle time of the curing process during the building process, which is a large scale scheduling problem, which poses difficulties. In this paper, we define this as a lot size scheduling problem in large scale and propose reinforcement learning methodology for this. We compare and analyze intuitive rule based heuristic algorithms and reinforcement learning based methodology, and compare the differences in performance with mixed integer programming models. Finally, we want to analyze the behavior of reinforcement learning models and confirm their applicability to real-world sites.
Advisors
Jang, Young Jaeresearcher장영재researcher
Description
한국과학기술원 :산업및시스템공학과,
Publisher
한국과학기술원
Issue Date
2021
Identifier
325007
Language
eng
Description

학위논문(석사) - 한국과학기술원 : 산업및시스템공학과, 2021.8,[iv, 28 p. :]

Keywords

Lot size scheduling▼aParallel machines scheduling▼aLarge scale problem▼aTire factory▼aReinforcement learning; 로트 사이즈 스케줄링▼a병렬기계 스케줄링▼a대규모 문제▼a타이어 공장▼a강화 학습

URI
http://hdl.handle.net/10203/295334
Link
http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=963725&flag=dissertation
Appears in Collection
IE-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0