Scheduling of multi-slot cluster tools with wafer delay constraints웨이퍼 지연 제약을 고려한 다중 슬롯 클러스터 장비의 스케줄링

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 287
  • Download : 0
DC FieldValueLanguage
dc.contributor.advisorLee, Tae-Eog-
dc.contributor.advisor이태억-
dc.contributor.authorJee, Young-Jun-
dc.date.accessioned2022-04-15T01:54:03Z-
dc.date.available2022-04-15T01:54:03Z-
dc.date.issued2021-
dc.identifier.urihttp://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=956468&flag=dissertationen_US
dc.identifier.urihttp://hdl.handle.net/10203/294603-
dc.description.abstractCluster tools are widely used in most semiconductor manufacturing processes. As process technology advances and precise control become possible, a multi-slot cluster tool which has high productivity compared to the area by processing multiple wafers in each chamber has been developed and operated. This multi-slot cluster tool's production efficiency increases when the tool consists of resources with extended structures. As the number of slots in the chamber increases, the equipment has higher productivity, but the quality of the wafer deteriorates because the delay of the processed wafers exposed to residual heat and gas in the chamber increases. In order to develop and operate cost-effective equipment, scheduling in consideration of wafer delay while responding to various structures is essential, but studies related to this have not been conducted yet. Therefore, in this study, we proposed a methodology to determine the schedule of the robot to minimize chamber delay through modeling of the multi-slot cluster tool with wafer delay constraints. We then proposed sequences for the robot with three or more arms and developed the model for determining the structure and schedule that guarantees the best performance for the process with time constraints through modeling-based analysis. Finally, we proposed a model that determines the equipment structure and schedule which includes the operation for the chamber, for the process with the chamber cleaning operation.-
dc.languageeng-
dc.titleScheduling of multi-slot cluster tools with wafer delay constraints-
dc.title.alternative웨이퍼 지연 제약을 고려한 다중 슬롯 클러스터 장비의 스케줄링-
dc.identifier.CNRN325007-
dc.description.department한국과학기술원 :산업및시스템공학과,-
dc.description.isOpenAccess학위논문(박사) - 한국과학기술원 : 산업및시스템공학과, 2021.2,[v, 92 p. :]-
dc.publisher.country한국과학기술원-
dc.type.journalArticleThesis(Ph.D)-
dc.contributor.alternativeauthor지영준-
dc.subject.keywordAuthorMulti-slot cluster tool▼aModeling▼aScheduling▼aWafer delay▼aChamber cleaning-
dc.subject.keywordAuthor다중 슬롯 클러스터 장비▼a모델링▼a스케줄링▼a웨이퍼 지연▼a챔버 클리닝-
Appears in Collection
IE-Theses_Ph.D.(박사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0