Accelerated cable-stayed bridge construction using terrestrial laser scanning

Cited 25 time in webofscience Cited 12 time in scopus
  • Hit : 457
  • Download : 0
This study developed a new methodology for measuring and predicting the time variance of the relative displacement between two prefabricated segments during bridge construction to expedite the construction process. In particular, the methodology enables the automated estimation of the relative displacement between two bridge segments. The methodology was applied during the construction of the Cheonsa Bridge in South Korea. First, a terrestrial laser scanner was used to extract the 3D positions of two bridge segments (Segments 17 and 20) simultaneously. Then, the 3D positions of the two segments were monitored over the course of two days to estimate the variation in the relative displacement between the two segments due to daily thermal loading. Given that Segment 18 is attached to Segment 17, the relative displacement between Segments 18 and 20 was predicted based on the displacement between segments 17 and 20. Subsequently, the optimal dimensions of the key segment (Segment 19) to be installed between Segments 18 and 20 were determined, and the key segment was fabricated accordingly. By processing the installment of Segment 18 and the fabrication of Segment 19 in parallel, the construction time of the Cheonsa Bridge was reduced by 10 days.
Publisher
ELSEVIER
Issue Date
2020-09
Language
English
Article Type
Article
Citation

AUTOMATION IN CONSTRUCTION, v.117

ISSN
0926-5805
DOI
10.1016/j.autcon.2020.103269
URI
http://hdl.handle.net/10203/275079
Appears in Collection
CE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 25 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0