Wafer delay analysis and control of dual-armed cluster tools with chamber cleaning operations

Cited 12 time in webofscience Cited 7 time in scopus
  • Hit : 484
  • Download : 0
DC FieldValueLanguage
dc.contributor.authorYu, Tae-Sunko
dc.contributor.authorLee, Tae-Eogko
dc.date.accessioned2020-05-14T07:20:17Z-
dc.date.available2020-05-14T07:20:17Z-
dc.date.created2019-05-13-
dc.date.issued2020-01-
dc.identifier.citationINTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.58, no.2, pp.434 - 447-
dc.identifier.issn0020-7543-
dc.identifier.urihttp://hdl.handle.net/10203/274194-
dc.description.abstractAs the design of integrated circuits has become increasingly complicated and dense, serious wafer quality problems are observed in modern wafer fabrication facilities. Therefore, in cluster tools of leading fabs process chambers are periodically cleaned in order to eliminate residual chemicals and impurities that can damage the wafer quality. A chamber cleaning operation is mainly applied to tools in which a wafer delay has a crucial impact on the wafer quality, and hence the need of wafer delay control becomes more significant when chamber cleaning is considered. Thus, we first examine how wafer delays can be specified for cluster tools with chamber cleaning operations. We confirm that wafer delays are substantially increased when chambers are periodically cleaned, and we show that such increased wafer delays cannot be eliminated or reduced using the existing scheduling methods. In such a case, we prove that a partial loading strategy can minimise both the tool cycle time and the wafer delays by controlling the number of wafers being loaded into parallel chambers. We also present how wafer delays under the partial loading strategy can be further reduced by introducing a timing control method that regulates the start times of robot tasks.-
dc.languageEnglish-
dc.publisherTAYLOR & FRANCIS LTD-
dc.titleWafer delay analysis and control of dual-armed cluster tools with chamber cleaning operations-
dc.typeArticle-
dc.identifier.wosid000465766100001-
dc.identifier.scopusid2-s2.0-85063504212-
dc.type.rimsART-
dc.citation.volume58-
dc.citation.issue2-
dc.citation.beginningpage434-
dc.citation.endingpage447-
dc.citation.publicationnameINTERNATIONAL JOURNAL OF PRODUCTION RESEARCH-
dc.identifier.doi10.1080/00207543.2019.1593547-
dc.contributor.localauthorLee, Tae-Eog-
dc.contributor.nonIdAuthorYu, Tae-Sun-
dc.description.isOpenAccessN-
dc.type.journalArticleArticle-
dc.subject.keywordAuthorscheduling-
dc.subject.keywordAuthorcluster tool-
dc.subject.keywordAuthorcleaning-
dc.subject.keywordAuthorwafer delay-
dc.subject.keywordAuthortime constraint-
dc.subject.keywordAuthorquality control-
dc.subject.keywordAuthorsemiconductor manufacturing-
dc.subject.keywordPlusTIME-VARIATION-
dc.subject.keywordPlusROBOTIC CELLS-
dc.subject.keywordPlusPETRI NETS-
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 12 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0