Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module

Cited 19 time in webofscience Cited 0 time in scopus
  • Hit : 705
  • Download : 0
DC FieldValueLanguage
dc.contributor.authorKim, Dae-Kyuko
dc.contributor.authorKim, Hyunjungko
dc.contributor.authorLee, Tae-Eogko
dc.date.accessioned2017-06-05T02:06:36Z-
dc.date.available2017-06-05T02:06:36Z-
dc.date.created2017-05-22-
dc.date.created2017-05-22-
dc.date.created2017-05-22-
dc.date.created2017-05-22-
dc.date.created2017-05-22-
dc.date.issued2017-07-
dc.identifier.citationINTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.55, no.11, pp.3092 - 3109-
dc.identifier.issn0020-7543-
dc.identifier.urihttp://hdl.handle.net/10203/223866-
dc.description.abstractWe examine a cyclic scheduling problem of sequentially connected cluster tools with a single input and output module, which includes multi-cluster tools and linear cluster tools. Every component tool has a dual-armed robot, and chambers are parallelised for a long process step. An intermediate buffer between each pair of adjacent component tools has a limited capacity, and all processed wafers should return to the input and output module. To examine the scheduling problem, we first compute workloads of the process steps and robots to obtain a lower bound on the tool cycle time. We then identify a rule of assigning the chambers to the process steps that makes the tool cycle time independent of the order of using the parallel chambers. We also propose a simple robot task sequence which is modified from the well-known swap sequence for each component tool. We prove that the modified swap sequence is optimal when one of the process steps, not a robot, is the bottleneck. We also present a scheduling strategy which controls robot task timings to deal with interference of wafer flows between each pair of adjacent component tools. Finally, we perform numerical experiments to show the performance of the proposed sequence.-
dc.languageEnglish-
dc.publisherTAYLOR & FRANCIS LTD-
dc.titleOptimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module-
dc.typeArticle-
dc.identifier.wosid000400004400005-
dc.identifier.scopusid2-s2.0-84991031548-
dc.type.rimsART-
dc.citation.volume55-
dc.citation.issue11-
dc.citation.beginningpage3092-
dc.citation.endingpage3109-
dc.citation.publicationnameINTERNATIONAL JOURNAL OF PRODUCTION RESEARCH-
dc.identifier.doi10.1080/00207543.2016.1243819-
dc.contributor.localauthorKim, Hyunjung-
dc.contributor.localauthorLee, Tae-Eog-
dc.contributor.nonIdAuthorKim, Dae-Kyu-
dc.description.isOpenAccessN-
dc.type.journalArticleArticle-
dc.subject.keywordAuthormulti-cluster tool-
dc.subject.keywordAuthoroptimal scheduling-
dc.subject.keywordAuthorrobot scheduling-
dc.subject.keywordAuthorsemiconductor manufacture-
dc.subject.keywordAuthorworkload analysis-
dc.subject.keywordPlusRESIDENCY TIME CONSTRAINTS-
dc.subject.keywordPlusSTEADY-STATE THROUGHPUT-
dc.subject.keywordPlusPETRI-NET-
dc.subject.keywordPlusMULTICLUSTER TOOLS-
dc.subject.keywordPlusBOUND ALGORITHM-
dc.subject.keywordPlusEVENT GRAPH-
dc.subject.keywordPlusSYSTEMS-
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 19 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0