Heuristic algorithms to minimize total tardiness in an identical-parallel-machine scheduling problem with flexible maintenance

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 384
  • Download : 20
DC FieldValueLanguage
dc.contributor.authorLee, Ju-Yong-
dc.contributor.authorKim, Yeong-Dae-
dc.contributor.authorJeong, BongJoo-
dc.date.accessioned2014-09-01T08:43:48Z-
dc.date.available2014-09-01T08:43:48Z-
dc.date.created2014-01-07-
dc.date.issued2013-12-06-
dc.identifier.citationAsia Pacific Industrial Engineering and Management Systems Conference , v., no., pp. --
dc.identifier.urihttp://hdl.handle.net/10203/189685-
dc.languageENG-
dc.publisherPhilippine Institute of Industrial Engineers-
dc.titleHeuristic algorithms to minimize total tardiness in an identical-parallel-machine scheduling problem with flexible maintenance-
dc.typeConference-
dc.type.rimsCONF-
dc.citation.publicationnameAsia Pacific Industrial Engineering and Management Systems Conference-
dc.identifier.conferencecountryPhilippines-
dc.contributor.localauthorKim, Yeong-Dae-
dc.contributor.nonIdAuthorLee, Ju-Yong-
dc.contributor.nonIdAuthorJeong, BongJoo-

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0