Production system-based simulation for backward on-line job change scheduling

Cited 8 time in webofscience Cited 9 time in scopus
  • Hit : 477
  • Download : 11
DC FieldValueLanguage
dc.contributor.authorKim, Tae-Dongko
dc.contributor.authorChoi, Byoung-Kyuko
dc.date.accessioned2014-08-29T01:08:33Z-
dc.date.available2014-08-29T01:08:33Z-
dc.date.created2014-01-20-
dc.date.created2014-01-20-
dc.date.issued2014-01-
dc.identifier.citationSIMULATION MODELLING PRACTICE AND THEORY, v.40, pp.12 - 27-
dc.identifier.issn1569-190X-
dc.identifier.urihttp://hdl.handle.net/10203/188692-
dc.description.abstractBackward on-line job change scheduling, referring to the on-line job change scheduling of a current processing step to satisfy the job change schedule of the subsequent processing step, is a common problem in modern Fabs. In this research, the production system-based simulation methodology is proposed to solve the backward on-line job change scheduling problem. This simulation is processed by the state change that is caused by an execution of the operator, and it finds the schedule with the best handle values considering the current status. Several simulation runs with diverse handle values were required to find the best values because the status of the shop floor can change dynamically. To validate the simulation, this production system-based simulation is applied to the on-line job change scheduling of a tire belt processing step as part of the tire manufacturing process.-
dc.languageEnglish-
dc.publisherELSEVIER SCIENCE BV-
dc.subjectEXPERT-SYSTEM-
dc.titleProduction system-based simulation for backward on-line job change scheduling-
dc.typeArticle-
dc.identifier.wosid000328593000002-
dc.identifier.scopusid2-s2.0-84883864863-
dc.type.rimsART-
dc.citation.volume40-
dc.citation.beginningpage12-
dc.citation.endingpage27-
dc.citation.publicationnameSIMULATION MODELLING PRACTICE AND THEORY-
dc.identifier.doi10.1016/j.simpat.2013.08.003-
dc.embargo.liftdate9999-12-31-
dc.embargo.terms9999-12-31-
dc.contributor.localauthorChoi, Byoung-Kyu-
dc.type.journalArticleArticle-
dc.subject.keywordAuthorOn-line job change scheduling-
dc.subject.keywordAuthorProduction system-
dc.subject.keywordAuthorSimulation-
dc.subject.keywordPlusEXPERT-SYSTEM-
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 8 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0