Showing results 1 to 7 of 7
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness Lee, GC; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4731 - 4743, 2004-11 |
A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times Sung, Chang Sup; Kim, Hyun Ah, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.113, no.2, pp.1038 - 1048, 2008 |
Fire scheduling for planned artillery attack operations under time-dependent destruction probabilities Cha, YH; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.38, pp.383 - 392, 2010-10 |
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02 |
Machine capacity allocation strategies for scheduling a large multi-chip assembly line Lee, Sang-Jin; Lee, Tae-Eog, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, pp.327 - 337, 2011 |
Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS & INDUSTRIAL ENGINEERING, v.114, pp.22 - 30, 2017-12 |
Minimizing total tardiness on a two-machine re-entrant flowshop Choi, Seong-Woo; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.199, no.2, pp.375 - 384, 2009-12 |
Discover