Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Subject MAKESPAN

Showing results 1 to 10 of 10

1
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints

Joo, Byung Jun; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.60, pp.572 - 582, 2009-04

2
Algorithms for a two-machine flowshop problem with jobs of two classes

Jeong, BongJoo; Kim, Yeong-Dae; Shim, Sang-Oh, INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, v.27, no.6, pp.3123 - 3143, 2020-11

3
Algorithms for Aircraft Flight and Maintenance Scheduling in an Army Aviation Unit

Lee, Dong-Hoon; Jeong, Bong-Joo; Kim, Bong-Kyun; Lee, Ju-Yong; Jang, Sebong; Kim, Yeong-Dae, MILITARY OPERATIONS RESEARCH, v.21, no.3, pp.5 - 17, 2016

4
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint

Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02

5
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance

Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.39, no.9, pp.2196 - 2205, 2012-09

6
Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine

Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS & INDUSTRIAL ENGINEERING, v.114, pp.22 - 30, 2017-12

7
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times

Jeong, Bong Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.47, pp.72 - 80, 2014-07

8
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop

Choi, SW; Kim, Yeong-Dae; Lee, GC, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.43, pp.2149 - 2167, 2005-06

9
Minimizing total tardiness on a two-machine re-entrant flowshop

Choi, Seong-Woo; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.199, no.2, pp.375 - 384, 2009-12

10
Parallel machine scheduling with multiple processing alternatives and sequence-dependent setup times

Kim, Jun; Kim, Hyun-Jung, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.59, no.18, pp.5438 - 5453, 2021-09

rss_1.0 rss_2.0 atom_1.0