Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Subject APPROXIMATION

Showing results 1 to 8 of 8

1
A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times

Sung, Chang Sup; Kim, Hyun Ah, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.113, no.2, pp.1038 - 1048, 2008

2
Bayesian optimization for a multiple-component system with target values

Jeong, Jihwan; Shin, Hayong, Computers & Industrial Engineering, v.157, pp.107310, 2021-07

3
Die-cavity pocketing via cutting simulation

Choi, Byoung Kyu; Kim, BH, COMPUTER-AIDED DESIGN, v.29, no.12, pp.837 - 846, 1997-12

4
Directional offset of a spatial curve for practical engineering design

Shin, Hayong; Yoo, SK; Cho, SK; Chung, WH, COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCA 2003, PT 3, PROCEEDINGS BOOK SERIES: LECTURE NOTES IN COMPUTER SCIENCE, v.2669, pp.711 - 720, 2003

5
Finding a risk-constrained shortest path for an unmanned combat vehicle

Bae, Kyung-Yeol; Kim, Yeong-Dae; Han, Jun Hee, COMPUTERS INDUSTRIAL ENGINEERING, v.80, pp.245 - 253, 2015-02

6
HEURISTICS FOR FLOWSHOP SCHEDULING PROBLEMS MINIMIZING MEAN TARDINESS

Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.1, pp.19 - 28, 1993-01

7
NURBS surface fitting using orthogonal coordinate transform for rapid product development

Bae, Seok-Hyung; Choi, Byoung Kyu, COMPUTER-AIDED DESIGN, v.34, no.10, pp.683 - 690, 2002-09

8
Parametric-surface adaptive tessellation based on degree reduction

Bae, Seok-Hyung; Shin, Hayong; Jung, Won-Hyung; Choi, Byoung-Kyu, COMPUTERS & GRAPHICS-UK, v.26, no.5, pp.709 - 719, 2002-10

rss_1.0 rss_2.0 atom_1.0