Showing results 1 to 6 of 6
Minimizing tool costs subject to a makespan constraint in a flexible manufacturing system Lim, Seung-Kil; Lee, Geun-Cheol; Choi, Seong-Kook; Kim, Yeong-Dae, Asia-Pacific Conference on Industrial Engineering and Management Systems, pp.243 - 246, 1999 |
Multi-Period Part Selection and Loading Problems in Flexible Manufacturing Systems Kim, Y-D.; Lee, Dong-Ho; Lim, Seung-Kil; Lee, Geun-Cheol; Jun, Hong-Bae, Computer and Industrial Engineering, vol.33, no.3-4, pp.541-544, 1997 |
Phased implementation of flexible technology under budget restrictions = 예산제약하에서의 유연 생산설비의 단계적 도입방안에 관한 연구link Lim, Seung-Kil; 임승길; et al, 한국과학기술원, 1995 |
Plant location and capacity planning for components procurement under global manufacturing environments = 글로벌 제조환경에서의 부품 조달을 위한 공장 입지 선정 및 생산 용량 계획link Lim, Seung-Kil; 임승길; et al, 한국과학기술원, 2000 |
Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System Kim, Yeong-Dae; Kang, Jae-Hun; Lee, Gyeong-Eun; Lim, Seung-Kil, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.24, no.1, pp.14 - 26, 2011-02 |
Tool requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint. Kim, Y-D; Lee, Geun-Cheol; Lim, Seung-Kil; Choi, Seong-Kook, International Journal of Production Research, Volume 41, Issue 14 September 2003 , pages 3339 - 3357, 2003 |
Discover