Showing results 1 to 36 of 36
A heuristic algorithm for identical parallel machine scheduling: splitting jobs, sequence-dependent setup times, and limited setup operators Lee, Jun-Ho; Kim, Hyun-Jung, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, v.33, no.4, pp.992 - 1026, 2021-12 |
A Petri net-based modeling and scheduling with a branch and bound algorithm Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho, IEEE Conference on Systems, Man, and Cybernetics, IEEE, 2012-10-16 |
Analysis of Backward Sequence for Single-Armed Cluster Tools With Processing Time Variations Lee, Jun-Ho; Kim, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.17, no.4, pp.2167 - 2174, 2020-10 |
Closed-Form Expressions on Lot Completion Time for Dual-Armed Cluster Tools With Parallel Processing Modules Kim, Hyunjung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.2, pp.898 - 907, 2019-04 |
Completion Time Analysis of Wafer Lots in Single-Armed Cluster Tools With Parallel Processing Modules Lee, Jun-Ho; Kim, Hyunjung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.14, no.4, pp.1622 - 1633, 2017-10 |
Concurrent processing of multiple wafer types in a single-armed cluster tool Lee, Jun-Ho; Lee, Tae-Eog, IEEE 2011 International Conference on Automation Science and Engineering, pp.102 - 107, IEEE, 2011-08-25 |
Cycle Planning for Concurrent Processing in a Dual-Armed Cluster Tool Kim, Hong-yeon; Lee, Jun-Ho; Kim, Hyunjung, 19th IEEE International Conference on Automation Science and Engineering, IEEE Robotics and Automation Society, 2023-08-28 |
Deep Reinforcement Learning With a Look-Ahead Search for Robotic Cell Scheduling Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, v.54, no.1, pp.622 - 633, 2024-01 |
Iterative job splitting algorithms for parallel machine scheduling with job splitting and setup resource constraints Lee, Jun-Ho; Jang, Hoon; Kim, Hyun-Jung, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.72, no.4, pp.780 - 799, 2021-03 |
Look-ahead based reinforcement learning for robotic flow shop scheduling Kim, Hyun-Jung; Lee, Jun-Ho, JOURNAL OF MANUFACTURING SYSTEMS, v.68, pp.160 - 175, 2023-06 |
Makespan Analysis of Lot Switching Period in Cluster Tools Lee, Jun-Ho; Kim, Hyunjung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.29, no.2, pp.127 - 136, 2016-05 |
Non-Cyclic Scheduling of a Wet Station Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.4, pp.1262 - 1274, 2014-10 |
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04 |
Reinforcement learning approach for scheduling dual-gripper robotic cells with processing time variations Lee, Jun-Ho; Kim, Hyunjung, IEEE International Conference on Automation Science and Engineering, IEEE Robotics and Automation Society, 2020-08-20 |
Reinforcement learning for robotic flow shop scheduling with processing time variations Lee, Jun-Ho; Kim, Hyun-Jung, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.60, no.7, pp.2346 - 2368, 2022-04 |
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07 |
Scheduling a wet station using a branch and bound algorithm Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho, IEEE Conference on Systems, Man, and Cybernetics, IEEE, 2012-10-16 |
Scheduling cluster tools for concurrent processing of multiple wafer types = 복수 웨이퍼 혼류생산을 위한 클러스터 장비 스케줄링link Lee, Jun-Ho; 이준호; et al, 한국과학기술원, 2013 |
Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.2, pp.525 - 536, 2014-04 |
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10 |
Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots Kim, Hyun-Jung; Lee, Jun-Ho; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.1, pp.145 - 159, 2013-01 |
Scheduling dual-armed cluster tools with cleaning processes Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06 |
Scheduling In-Line Multiple Cluster Tools Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05 |
Scheduling in-line multiple cluster tools: A decomposition approach Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho; Kim, Chulhan; Baik, Sun-Hee, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08 |
Scheduling Lot Switching Operations for Cluster Tools Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11 |
Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04 |
Scheduling of step-improving jobs with an identical improving rate Kim, Hyunjung; Kim, Eun-Seok; Lee, Jun-Ho, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.73, no.5, pp.1127 - 1136, 2022-05 |
Scheduling timed Petri nets with a time-feasible reachability tree Kim, Hyun-Jung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE Conference on Networking, Sensing, and Control, pp.94 - 99, IEEE Systems, Man, and Cybernetics Society, 2013-04-10 |
Scheduling transient periods of dual-armed cluster tools Lee, Tae-Eog; Lee, Jun-Ho; Kim, Hyun-Jung, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08 |
Scheduling Transient Periods of Single-Armed Cluster Tools Lee, Jun-Ho; Lee, Tae-Eog, IEEE 2012 International Conference on Robotics and Automation, pp.5062 - 5067, IEEE, 2012-05-17 |
Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers Kim, Hyun-Jung; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.126, 2021-02 |
Single machine scheduling with a distributed energy resource and energy storage system Kim, Hyunjung; Lee, Jun-Ho; Kim, Eun-Seok; Tang, Lixin; Yang, yang, IEEE International Conference on Automation Science and Engineering, IEEE Robotics and Automation Society, 2020-08-20 |
Single-machine scheduling with energy generation and storage systems Kim, Hyun-Jung; Kim, Eun-Seok; Lee, Jun-Ho; Tang, Lixin; Yang, Yang, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.60, no.23, pp.7033 - 7052, 2022-12 |
The Impact of Processing Time Variations on Swap Sequence Performance in Dual-Armed Cluster Tools Lee, Jun-Ho; Kim, Hyun-Jung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.20, no.4, pp.2668 - 2677, 2023-10 |
Three-machine flow shop scheduling with overlapping waiting time constraints Kim, Hyunjung; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.101, pp.93 - 102, 2019-01 |
Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.3, pp.1007 - 1016, 2015-07 |
Discover