Showing results 1 to 7 of 7
A study on facility layout planning using graph theory Kim, Jae-Gon; Lee, Geun-Cheol; Kim, Yeong-Dae, 20th International Conference on Computers and Industrial Engineering, pp.741 - 744, 1996 |
Minimizing tool costs subject to a makespan constraint in a flexible manufacturing system Lim, Seung-Kil; Lee, Geun-Cheol; Choi, Seong-Kook; Kim, Yeong-Dae, Asia-Pacific Conference on Industrial Engineering and Management Systems, pp.243 - 246, 1999 |
Multi-Period Part Selection and Loading Problems in Flexible Manufacturing Systems Kim, Y-D.; Lee, Dong-Ho; Lim, Seung-Kil; Lee, Geun-Cheol; Jun, Hong-Bae, Computer and Industrial Engineering, vol.33, no.3-4, pp.541-544, 1997 |
Production planning and scheduling in a leadframe manufacturing system Lee, Geun-Cheol; Choi, Yong-Chan; Lee, Eun-Young; Kim, Yeong-Dae, INFOMRS-KORMS 2000, pp.970 -, 2000 |
Scheduling problems with due date-related measures for hybrid flowshops = 혼합 흐름 공정에서의 납기를 고려한 일정계획에 관한 연구link Lee, Geun-Cheol; 이근철; et al, 한국과학기술원, 2003 |
Shaping algorithms for facility layout problems = 설비배치 문제에서의 설비모양 교정 알고리듬link Lee, Geun-Cheol; 이근철; et al, 한국과학기술원, 1997 |
Tool requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint. Kim, Y-D; Lee, Geun-Cheol; Lim, Seung-Kil; Choi, Seong-Kook, International Journal of Production Research, Volume 41, Issue 14 September 2003 , pages 3339 - 3357, 2003 |
Discover