Showing results 1 to 4 of 4
Bottleneck-focused scheduling for a hybrid flowshop Lee, GC; Kim, Yeong-Dae; Choi, SW, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.165 - 181, 2004-01 |
MINIMIZING MAKESPAN ON A TWO-MACHINE RE-ENTRANT FLOWSHOP Choi, SW; Kim, Yeong-Dae, Asia Pacific Industrial Engineering and Management Systems Conference, pp.31.19.1 - 31.19.10, 2004 |
Minimizing makespan on a two-machine re-entrant flowshop Choi, SW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.972 - 981, 2007-07 |
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop Choi, SW; Kim, Yeong-Dae; Lee, GC, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.43, pp.2149 - 2167, 2005-06 |
Discover