Showing results 1 to 22 of 22
A due-date-based algorithm for lot-order assignment in a semiconductor wafer fabrication facility Bang, J.-Y.; An, K.-Y.; Lim, S.-K.; Kim, Yeong-Dae, International Conference on Modeling and Analysis of Semiconductor Manufacturing, pp.209 - 215, 2005 |
A facility location and operation problem of a two-level supply chain with variable capacity levels for production-time-dependent products Han, Jun-Hee; Kim, Yeong-Dae; Yang, Ji-Won, Asia Pacific Industrial Engineering and Management Systems Conference , Philippine Institute of Industrial Engineers, 2013-12-05 |
A study on facility layout planning using graph theory Kim, Jae-Gon; Lee, Geun-Cheol; Kim, Yeong-Dae, 20th International Conference on Computers and Industrial Engineering, pp.741 - 744, 1996 |
An analytic hierarchy process model for economic justification of internet contents business opportunities in Korea Choi, Yong-Chan; Kang, Jun-Gyu; Park, Moon-Won; Kim, Yeong-Dae, Asia-Pacific Conference on Industrial Engineering and Management Systems, pp.405 - 408, 1999 |
Batching and scheduling at batch processing workstation in a semiconductior fabrication facility producing multiple product types with distinct due dates Kim, Hyung-Un; Kim, Jae-Gon; Kim, Yeong-Dae, International Conference on Modeling and Analysis of Semiconductor Manufacturing, pp.79 -, 2000 |
Due-date oriented scheduling rules for semiconductor assembly and test operation Low, Malcolm Y. H.; Lee, Tae-Eog; Kim, Yeong-Dae, Asia-Pacific Management Conference, pp.1043 - 1056, 2004 |
Heuristic algorithms to minimize total tardiness in an identical-parallel-machine scheduling problem with flexible maintenance Lee, Ju-Yong; Kim, Yeong-Dae; Jeong, BongJoo, Asia Pacific Industrial Engineering and Management Systems Conference , Philippine Institute of Industrial Engineers, 2013-12-06 |
HEURISTICS FOR A TWO-STAGE HYBRID FLOWSHOP SCHEDULINGPROBLEM WITH INCOMPATIBLE JOB FAMILIES Joo, Byung-Jun; Kim, Yeong-Dae, Asia Pacific Industrial Engineering and Management Systems Conference, pp.31.15.1 - 31.15.7, 2004 |
Heuristics for scheduling jobs with distinct ready times on a two-stage hybrid flowhop scheduling problem with a product-mix ratio constraint Joo, Byung-Jun; Shin, Jong-Ho; Kim, Yeong-Dae, Asia-Pacific Management Conference, pp.965 - 978, 2004 |
Heuristics for searching multiple areas to find targets using a single search resource Lee, Ho-Joo; Kim, Yeong-Dae, Asia-Pacific Management Conference, pp.659 - 672, 2004 |
Minimizing bullwhip effect in supply chains Duc, T.T.H.; Luong, H.T.; Kim, Yeong-Dae, IEEE International Conference on Industrial Engineering and Engineering Management, IEEM2010, pp.225 - 229, IEEE, 2010-12-07 |
MINIMIZING MAKESPAN ON A TWO-MACHINE RE-ENTRANT FLOWSHOP Choi, SW; Kim, Yeong-Dae, Asia Pacific Industrial Engineering and Management Systems Conference, pp.31.19.1 - 31.19.10, 2004 |
Minimizing makespan on two-machine re-entrant flowshop Choi, Seong-Woo; Kim, Yeong-Dae, International Conference on Computers and Industrial Engineering, pp.CIE453 - CIE453, 2004 |
Minimizing tool costs subject to a makespan constraint in a flexible manufacturing system Lim, Seung-Kil; Lee, Geun-Cheol; Choi, Seong-Kook; Kim, Yeong-Dae, Asia-Pacific Conference on Industrial Engineering and Management Systems, pp.243 - 246, 1999 |
Minimizing total tardiness in an unrelated parallel-machine scheduling problem Shim, Sang-Oh; Kim, Yeong-Dae, Asia-Pacific Management Conference, pp.979 - 990, 2004 |
Multi-product lot merging/splitting algorithms for a semiconductor wafer fabrication Bang, J.-Y.; Kang, J.-H.; Kim, B.-K.; Kim, Yeong-Dae, 2008 Winter Simulation Conference, WSC 2008, pp.2209 - 2215, 2008-12-07 |
Production planning and scheduling in a leadframe manufacturing system Lee, Geun-Cheol; Choi, Yong-Chan; Lee, Eun-Young; Kim, Yeong-Dae, INFOMRS-KORMS 2000, pp.970 -, 2000 |
Scheduling two-machine flowshop with limited waiting time to minimize makespan Joo, Byung-Jun; Kim, Yeong-Dae, International Conference on Computers and Industrial Engineering, pp.CIE561 - CIE561, 2004 |
Scheduling wafer lots on diffusion machines in a semiconductor wafer fabrication facility Choi, So-Young; Joo, Byung-Jun; Kim, Yeong-Dae, International Conference on Modeling and Analysis of Semiconductor Manufacturing, pp.28 - 33, 2005 |
Simulated annealing algorithms for locating pickup and delivery points in an automated guided vehicle system Kim, Jae-Gon; Lee, Dong-Ho; Kim, Yeong-Dae, The 1st Korea-Japan Joint Conference on Industrial Engineering and Management, pp.177 - 182, 1998 |
Simulation-based real-time scheduling in a semiconductor wafer fabrication facility Shim, Sang Oh; Choi, Bum; Kim, Yeong-Dae, Asia-Pacific Conference on Industrial Engineering and Management Systems, pp.91 - 95, 2000 |
Tardiness minimization in unrelated parallel machine scheduling problems Shim, Sang-Oh; Kim, Yeong-Dae, International Conference on Computers and Industrial Engineering, pp.CIE619 - CIE619, 2004 |
Discover