Showing results 1 to 3 of 3
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02 |
Heuristics for scheduling jobs with distinct ready times on a two-stage hybrid flowhop scheduling problem with a product-mix ratio constraint Joo, Byung-Jun; Shin, Jong-Ho; Kim, Yeong-Dae, Asia-Pacific Management Conference, pp.965 - 978, 2004 |
Two-stage hybrid flowshop scheduling problem with a product ratio constraint under dynamic job arrivals = 제품별 구성 비율 제약이 있는 혼합 흐름 공정에서 최대 종료 시간을 최소화하는 스케쥴링 방법 개발link Shin, Jong-Ho; 신종호; et al, 한국과학기술원, 2003 |
Discover