Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Title 

Showing results 481 to 500 of 5985

481
A two-level coevolutionary approach to multidimensional pattern classification problems

Lee, Ki-Kwang; Yoon, Wan Chul, The International Conference on Simulation and Modeling 2005, International Conference on Simulation and Modeling, 2005

482
A two-moment approximation for the GI/G/c queue with finite capacity

Choi, DW; Kim, NK; Chae, Kyung-Chul, INFORMS JOURNAL ON COMPUTING, v.17, no.1, pp.75 - 81, 2005

483
A Two-Phase Approach for Design of Supervisory Controllers for Robot Cells: Model Checking and Markov Decision Models

Lee, Tae-Eog; Lee, JW, 대한산업공학회/한국경영과학회 춘계공동학술대회, pp.120 - 120, 대한산업공학회/한국경영과학회, 1996-04

484
A two-phase approach for design of supervisory controllers for robot cells: Model checking and Markov decision models

Lee, Tae-Eog; Lee, JH, ANNALS OF OPERATIONS RESEARCH, v.77, pp.157 - 182, 1998-02

485
A Two-Phase Approach for Design of Supervisory Controllers for Robot Cells: Model Checking and Markov Decision Models

Lee, Tae-Eog; Lee, Jin-Whan, The 5th IEEE International Conference on Emerging Technology and Factory Automation, pp.56 - 62, IEEE, 1996-11

486
A Two-Phase Model for Usability Evaluation of Software User Interfaces

박경수, Proc. Ergonomics Soc. Kor., pp.313 - 319, 1997

487
A Two-Phase Queueing System with Fixed Batch Service Size

Kim Sehun, Hawaii International Conference on Statistics, Mathematics and Related Fields, 2008, 2008-08-29

488
A Two-Process Two Product Inventory Model on a Single Facility with By-Product

d.h. moon; hark hwang, 대한산업공학회지, v.12, no.2, pp.67 - 76, 1986

489
A Two-Product Three-Facility Production Planning Model in a Combined Paralled and Serial System

성창섭; B. J. Lee; Y. J. Lee, 대한산업공학회지, v.11, no.2, pp.47 - 56, 1985-04

490
A Two-Stage Batch Production System with Integer Ratio Lot Requirement Lot-Sizing Policy

황학, J. OF THE KOREAN INSTITUTE OF INDUSTRIAL ENGINEERS, v.17, no.1, 1991-01

491
A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times

Sung, Chang Sup; Kim, Hyun Ah, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.113, no.2, pp.1038 - 1048, 2008

492
A Unified approach to linear programming bounds for queueing networks: Systems with polyhedral invariance of transition probabilities

Morrison, James R; Kumar, P. R., IEEE Conference on Decision and Control, IEEE, 2000-12

493
A Unified Deep-Learning Model for Classifying the Cross-Country Skiing Techniques Using Wearable Gyroscope Sensors

Jang, Jihyeok; Ankit, Ankit; Kim, Jinhyeok; Jang, Young Jae; Kim, Hye Young; Kim, Jin Hae; Xiong, Shuping, SENSORS, v.18, no.11, 2018-11

494
A unified queue length formula for BMAP/G/1 queue with generalized vacations

Chang, SH; Takine, T; Chae, Kyung-Chul; Lee, HW, STOCHASTIC MODELS, v.18, no.3, pp.369 - 386, 2002

495
A uniformly distributed random portfolio

Kim, Woo Chang; Lee, Yongjae, QUANTITATIVE FINANCE, v.16, no.2, pp.297 - 307, 2016

496
A Unifying Framework of Mining Trajectory Patterns of Various Temporal Tightness

Lee, Jae-Gil; Han, Jiawei; Li, Xiaolei, IEEE TRANSACTIONS ON KNOWLEDGE AND DATA ENGINEERING, v.27, no.6, pp.1478 - 1490, 2015-06

497
A Variant of the Mean-Variance Model for the Portfolio Selection Problem and Management of Systemic Risk

박성수; 이충목; 최화용, 대한산업공학회 춘계공동학술대회, 대한산업공학회, 2013-05

498
A Video Semantic Annotation System Based on User Attention Analysis

Jin-Young Moon; Changseok Bae; Yoon, Wan Chul, The 4th International Conferences on Advances in Multimedia (MMEDIA2012), International Academy, Research, and Industry Association, 2012-05-01

499
A Virtual Cluster Tool for Cluster Tool Controller and Scheduler Development

Joo, Yong-Jae; Lee, Tae-Eog, MASM, pp.1 - 6, 2001-05

500
A Virtual Factory Emulator for Human-centered VMS

Choi, Byoung Kyu; Park, BC; Ryu, HY; Park, JH, The 35th CIRP International Seminar on Manufacturing Systems, pp.300 - 306, CIRP, 2002

rss_1.0 rss_2.0 atom_1.0