3661 | Production planning method using the push-back heuristic algorithm: Implementation in a micro filter manufacturer in South Korea Sung, Shin Woong; Jang, Young Jae; Lee, Sung Wook, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.14, no.4, pp.401 - 412, 2015-12 |
3662 | Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates Kim, Yeong-Dae; Kim, JG; Kim, HU, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.5, pp.589 - 598, 2001-10 |
3663 | Production scheduling in a system with batch processing machines = 뱃치 공정 설비를 갖춘 시스템에서의 생산일정계획link Choung, You-In; 정유인; et al, 한국과학기술원, 1999 |
3664 | Production Scheduling in Assembly/Disaasembly System 성창섭, 한국경영과학회/대한산업공학회 춘계공동학술대회, 1995 |
3665 | Production scheduling in assembly/disassembly systems = 조립 및 분리 생산 시스템에서의 일정계획link Yoon, Sang-Hum; 윤상흠; et al, 한국과학기술원, 1997 |
3666 | Production scheduling of products with subassemblies = 부분조립품을 가지는 제품의 생산일정계획link Kim, Tae-Hyung; 김태형; et al, 한국과학기술원, 1993 |
3667 | Production sequencing problem with re-entrant work flows and sequence dependent setup times Hwang, Hark, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.9, pp.2435 - 2450, 1998 |
3668 | Production Sequencing Problem with Reentrant Work Flows and Sequence Dependent Setup Times Hwang, Hark, , 1996-01-01 |
3669 | Production Sequencing Problem with Reentrant Work Flows and Sequence Dependent Setup Times Hwang, Hark, COMPUTERS & INDUSTRIAL ENGINEERING, v.33, no.3, pp.773 - 776, 1997-01 |
3670 | Production Switching Mechanism for an Unreliable Two-Stage Production Line 고시근; 황학, J. OF THE KOREAN INSTITUTE OF INDUSTRIAL ENGINEERS, v.24, no.1, pp.105 - 113, 1998-01 |
3671 | Production system-based simulation for backward on-line job change scheduling Kim, Tae-Dong; Choi, Byoung-Kyu, SIMULATION MODELLING PRACTICE AND THEORY, v.40, pp.12 - 27, 2014-01 |
3672 | Production-and-delivery Scheduling with Transportation Mode Selection Allowed 성창섭, 대한산업공학회, pp.1 - 20, 2005 |
3673 | Production-Delivery Scheduling Problem in Supply Chain Management Sung, Chang Sup, Multi-Echelon/MSOM 2004, 2004 |
3674 | Production-maintenance policy in a deteriorating production system = 열화하는 생산체계의 생산-정비 정책link Lee, Ji-Soo; 이지수; et al, 한국과학기술원, 1992 |
3675 | Products usability evaluation during the design and development phases = 설계 및 개발 단계에서 제품의 사용성 평가에 관한 연구link Lim, Chee-Hwan; 임치환; et al, 한국과학기술원, 1997 |
3676 | Progressive Model Construction for N-Sided Polygonal Meshes Kim, S; Park, S; Jung, W; Shin, Hayong, IJCC Workshop on Digital Engineering, pp.8 - 13, 2006-02 |
3677 | Project Management for Distributed Engineering Collaboration Lee, Tae-Eog; Seo, J.; Kim, J.-H.; Jung, S., CALS/EC Korea'98, pp.375 - 389, 1998-10 |
3678 | Project scheduling analysis under time window constraints : time constraints analysis, feedback control, resource leveling = Time window 시간제약을 가지는 프로젝트 스케줄링 분석: 시간제약 분석, feedback 제어, 자원 평준화link Park, Sang-Ho; Lee, Tae-Eog; et al, 한국과학기술원, 2023 |
3679 | Prompt-guided DETR with RoI-pruned masked attention for open-vocabulary object detection Song, Hwanjun; Bang, Jihwan, PATTERN RECOGNITION, v.155, 2024-11 |
3680 | Proposing and validating an automated method of cognitive knowledge structure creation = 단일 문서 기반 인지적 지식구조 자동 생성 기술 제안 및 검증link Kim, Hyung W.; 김형우; et al, 한국과학기술원, 2012 |