Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Title 

Showing results 3661 to 3680 of 6101

3661
Production planning method using the push-back heuristic algorithm: Implementation in a micro filter manufacturer in South Korea

Sung, Shin Woong; Jang, Young Jae; Lee, Sung Wook, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.14, no.4, pp.401 - 412, 2015-12

3662
Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates

Kim, Yeong-Dae; Kim, JG; Kim, HU, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.5, pp.589 - 598, 2001-10

3663
Production scheduling in a system with batch processing machines = 뱃치 공정 설비를 갖춘 시스템에서의 생산일정계획link

Choung, You-In; 정유인; et al, 한국과학기술원, 1999

3664
Production Scheduling in Assembly/Disaasembly System

성창섭, 한국경영과학회/대한산업공학회 춘계공동학술대회, 1995

3665
Production scheduling in assembly/disassembly systems = 조립 및 분리 생산 시스템에서의 일정계획link

Yoon, Sang-Hum; 윤상흠; et al, 한국과학기술원, 1997

3666
Production scheduling of products with subassemblies = 부분조립품을 가지는 제품의 생산일정계획link

Kim, Tae-Hyung; 김태형; et al, 한국과학기술원, 1993

3667
Production sequencing problem with re-entrant work flows and sequence dependent setup times

Hwang, Hark, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.9, pp.2435 - 2450, 1998

3668
Production Sequencing Problem with Reentrant Work Flows and Sequence Dependent Setup Times

Hwang, Hark, , 1996-01-01

3669
Production Sequencing Problem with Reentrant Work Flows and Sequence Dependent Setup Times

Hwang, Hark, COMPUTERS & INDUSTRIAL ENGINEERING, v.33, no.3, pp.773 - 776, 1997-01

3670
Production Switching Mechanism for an Unreliable Two-Stage Production Line

고시근; 황학, J. OF THE KOREAN INSTITUTE OF INDUSTRIAL ENGINEERS, v.24, no.1, pp.105 - 113, 1998-01

3671
Production system-based simulation for backward on-line job change scheduling

Kim, Tae-Dong; Choi, Byoung-Kyu, SIMULATION MODELLING PRACTICE AND THEORY, v.40, pp.12 - 27, 2014-01

3672
Production-and-delivery Scheduling with Transportation Mode Selection Allowed

성창섭, 대한산업공학회, pp.1 - 20, 2005

3673
Production-Delivery Scheduling Problem in Supply Chain Management

Sung, Chang Sup, Multi-Echelon/MSOM 2004, 2004

3674
Production-maintenance policy in a deteriorating production system = 열화하는 생산체계의 생산-정비 정책link

Lee, Ji-Soo; 이지수; et al, 한국과학기술원, 1992

3675
Products usability evaluation during the design and development phases = 설계 및 개발 단계에서 제품의 사용성 평가에 관한 연구link

Lim, Chee-Hwan; 임치환; et al, 한국과학기술원, 1997

3676
Progressive Model Construction for N-Sided Polygonal Meshes

Kim, S; Park, S; Jung, W; Shin, Hayong, IJCC Workshop on Digital Engineering, pp.8 - 13, 2006-02

3677
Project Management for Distributed Engineering Collaboration

Lee, Tae-Eog; Seo, J.; Kim, J.-H.; Jung, S., CALS/EC Korea'98, pp.375 - 389, 1998-10

3678
Project scheduling analysis under time window constraints : time constraints analysis, feedback control, resource leveling = Time window 시간제약을 가지는 프로젝트 스케줄링 분석: 시간제약 분석, feedback 제어, 자원 평준화link

Park, Sang-Ho; Lee, Tae-Eog; et al, 한국과학기술원, 2023

3679
Prompt-guided DETR with RoI-pruned masked attention for open-vocabulary object detection

Song, Hwanjun; Bang, Jihwan, PATTERN RECOGNITION, v.155, 2024-11

3680
Proposing and validating an automated method of cognitive knowledge structure creation = 단일 문서 기반 인지적 지식구조 자동 생성 기술 제안 및 검증link

Kim, Hyung W.; 김형우; et al, 한국과학기술원, 2012

rss_1.0 rss_2.0 atom_1.0