Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Title 

Showing results 2881 to 2900 of 5983

2881
Minimizing makespan in a two-machine flowshop scheduling problem with delay time constraints = 두 단계 흐름 공정에서의 지연시간을 고려한 스케줄링에 관한 연구link

Son, Jung-Dae; 손정대; et al, 한국과학기술원, 2006

2882
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times

An, Young-Jin; Kim, Yeong-Dae; Choi, Seong-Woo, COMPUTERS & OPERATIONS RESEARCH, v.71, pp.127 - 136, 2016-07

2883
Minimizing Makespan in a Two-Machine Flowshop with Dynamic Arrivals Allowed

성창섭, 한국경영과학회 추계학술대회, 2000

2884
Minimizing Makespan in a Two-Machine Flowshop with Dynamic Arrivals Allowed

Sung, Chang Sup; Kim, YH, COMPUTERS AND OPERATIONS RESEARCH, v.29, no.3, pp.275 - 294, 2002-02

2885
Minimizing Makespan on a Single Burn-in Oven in Semiconductor Manufacturing

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.120, no.3, pp.559 - 574, 2000-02

2886
Minimizing Makespan on a Single Burn-In Oven wih Job Families and Dynamic Job Arrivals Allowed

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.120, no.3, pp.559 - 574, 2000-10

2887
MINIMIZING MAKESPAN ON A TWO-MACHINE RE-ENTRANT FLOWSHOP

Choi, SW; Kim, Yeong-Dae, Asia Pacific Industrial Engineering and Management Systems Conference, pp.31.19.1 - 31.19.10, 2004

2888
Minimizing makespan on a two-machine re-entrant flowshop

Choi, SW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.972 - 981, 2007-07

2889
Minimizing makespan on an m-machine re-entrant flowshop

Choi, Seong-Woo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.5, pp.1684 - 1696, 2008-05

2890
Minimizing makespan on two-machine re-entrant flowshop

Choi, Seong-Woo; Kim, Yeong-Dae, International Conference on Computers and Industrial Engineering, pp.CIE453 - CIE453, 2004

2891
Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed

Sung, Chang Sup; Yoon, SH, ENGINEERING OPTIMIZATION, v.28, no.3, pp.231 - 243, 1997-04

2892
Minimizing mean flow time on a single batch-processing machine for the burn-in test operation of semiconductor manufacturing = 반도체 제조 burn-in공정을 위한 배치 공정 설비에서 평균 흐름시간 최소화문제link

Hong, Yang-Pyo; 홍양표; et al, 한국과학기술원, 1996

2893
MINIMIZING MEAN TARDINESS AND EARLINESS IN SINGLE-MACHINE SCHEDULING PROBLEMS WITH UNEQUAL DUE-DATES

Kim, Yeong-Dae; YANO, CA, NAVAL RESEARCH LOGISTICS, v.41, no.7, pp.913 - 933, 1994-12

2894
Minimizing the number of patterns in the two-dimensional cutting stock problem

Paek, Seunghoon; Park, Sung-Soo, 대한산업공학회 추계학술대회, 대한산업공학회, 2018-11-09

2895
Minimizing the Number of Switching in an SS/TDMA System with Inter-Satellite Links and Variable Bandwidth Allowed

성창섭, 대한산업공학회 추계학술대회, pp.271 - 274, 2001

2896
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance

Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.39, no.9, pp.2196 - 2205, 2012-09

2897
Minimizing tool costs subject to a makespan constraint in a flexible manufacturing system

Lim, Seung-Kil; Lee, Geun-Cheol; Choi, Seong-Kook; Kim, Yeong-Dae, Asia-Pacific Conference on Industrial Engineering and Management Systems, pp.243 - 246, 1999

2898
Minimizing total tardiness in a single machine scheduling problem with periodically scheduled maintenance = 정기적인 정비 계획이 있는 단일 기계 공정에서의 납기지연 최소화를 위한 연구link

Du, Nguyen Van; Du, N. V.; et al, 한국과학기술원, 2009

2899
Minimizing total tardiness in a two parallel batch-and-single machines system with incompatible job families = 두 대로 구성된 병렬 (뱃치, 단독) 시스템에서 Incompatible job 패밀리에 대한 total tardiness 대상의 스케줄링 연구link

Tang, Chonglin; 당숭린; Tang, C. Lin; et al, 한국과학기술원, 2006

2900
Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine

Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS & INDUSTRIAL ENGINEERING, v.114, pp.22 - 30, 2017-12

rss_1.0 rss_2.0 atom_1.0