Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Issue Date 

Jump to a point in the index:

Showing results 261 to 280 of 5980

261
Spare-part Inventory Program for Fleet Maintenance

Park, Kyung Soo, INDUSTRIAL ENGINEERING, v.15, no.1, 1983-01

262
Optimal Scheduling of Multiple Preventive Maintenance Activities

Park, Kyung Soo, MICROELECTRONICS AND RELIABILITY, v.23, no.2, pp.351 - 354, 1983-03

263
Cost Limit Replacement Policy under Minimal Repair

Park, Kyung Soo, MICROELECTRONICS AND RELIABILITY, v.23, no.2, pp.347 - 349, 1983-03

264
Non-Stationary Inventory Position Processes

Sung, Chang Sup, STOCHASTIC PROCESSES AND THEIR APPLICATIONS, v.15, no.0, pp.83 - 91, 1983-04

265
비행체의 경로최적화

김세헌; 염건, 한국경영과학회지, v.8, no.1, pp.11 - 18, 1983-04

266
A Micro Approach in Science and Engineering Manpower Forecasting : An Experience in Korea

Sung, Chang Sup, pp.32 - 41, 1983-04-01

267
Ergodic Behavior of Nonstationary Finite Continuous - Time Markov Processes

Sung, Chang Sup, pp.25 - 31, 1983-04-01

268
Mathematical Analysis of the Reliability of a Modem Electronic Protective Device for Production Machinery

Choi, Byoung Kyu; Barash, M; Etherton, J, Proc. of the 7thInternation Conference of Production Research, pp.22 - 24, 1983-08

269
Another Inventory Model with a Mixture of Backorders and Lost Sales

Park, Kyung Soo, NAVAL RESEARCH LOGISTICS, v.30, no.3, 1983-09

270
Grapsing Force Control for A Robot Gripper Using A Pneumatic On-off Servomechanism

Suh, Hyo-Won; Cho, HS; Lee, CW, ASME Winter Annual Meeting:Control of Manufacturing Processes and Robotic Systems, pp.233 - 242, ASME, 1983-11

271
Measurement of Workload by Cardiac Arrhythmia

박경수, 대한인간공학회지, v.2, no.2, 1983-12

272
자유곡면 절삭을 위한 경제적인 CL 데이타 계산

김대현; 최병규, 대한산업공학회지, v.9, no.2, pp.27 - 35, 1983-12

273
(Ti,Si) Inventory Policy for Decaying Items with Time Proportional Demand

박경수, INTERNATIONAL JOURNAL OF POLICY AND INFORMATIONS, v.7, no.2, 1983-12

274
Optimal Allocation of Inspection Effort in a Multi-Stage production process

Yum, Bong-Jin, 한국경영과학회 추계 학술발표대회, pp.0 - 0, 1984

275
Average Mean Square Error of Prediction for a Multiple Functional Relationship Model

Yum, Bong-Jin, 한국통계학회 추계 학술논문발표대회, pp.0 - 0, 1984

276
Production Lot Size Model for Deteriorating Items with Shortage

Hwang, Hark; s.b. choi, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.15, no.11, 1984

277
A Mixed 0-1 Linear program for the Inspection Location Problem

염봉진, 대한산업공학회지, v.10, no.1, pp.11 - 16, 1984

278
AUTOMATIC RECOGNITION OF MACHINED SURFACES FROM A 3D SOLID MODEL

Choi, Byoung Kyu; BARASH, MM; ANDERSON, DC, COMPUTER-AIDED DESIGN, v.16, no.2, pp.81 - 86, 1984

279
ECONOMIC-PLANNING WITH INSTITUTIONAL PRICE CONSTRAINTS FOR A DECENTRALIZED ECONOMY

Kim, Sehun, MATHEMATICAL PROGRAMMING, v.29, no.1, pp.100 - 112, 1984

280
Graphic Comparison of Three-State Device Redundancies

Park, Kyung Soo, MICROELECTRONICS RELIABILITY, v.24, no.3, pp.461 - 464, 1984

rss_1.0 rss_2.0 atom_1.0