Showing results 1 to 5 of 5
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints Park, MW; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.123, no.3, pp.504 - 518, 2000-06 |
A heuristic algorithm for a production planning problem in an assembly system Park, MW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.2, pp.138 - 147, 1999-02 |
A systematic procedure for setting parameters in simulated annealing algorithms Park, MW; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.25, no.3, pp.207 - 217, 1998-03 |
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process Kim, Yeong-Dae; Lim, HG; Park, MW, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.91, no.1, pp.124 - 143, 1996-05 |
Search heuristics for a parallel machine scheduling problem with ready times and due dates Park, MW; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.33, no.3-4, pp.793 - 796, 1997-12 |
Discover