Browse "Dept. of Mechanical Engineering(기계공학과)" by Author Kim, Soo-Young

Showing results 1 to 8 of 8

1
Analysis and design of flat-die hot extrusion process 1. Three-dimensional finite element analysis

Lee, Guen-An; Kwak, Dae-Young; Kim, Soo-Young; Im, Yong-Taek, International Journal of Mechanical Sciences, Vol.44, No.5, pp.915-934, 2002-05

2
FCA용접용 아크센서의 개발 및 이를 이용한 로보트 용접에 관한 연구 = A study on the development of arc sensor for FCAW process and its application for robotic arc weldinglink

김수영; Kim, Soo-Young; et al, 한국과학기술원, 1992

3
Model based coordinated control of dual-loop EGR and VGT in a turbocharged diesel engine air-path system = 터보차져 디젤 엔진 공기순환계에서의 이중 방식 EGR과 VGT의 모델 기반 공동 제어link

Kim, Soo-Young; 김수영; et al, 한국과학기술원, 2014

4
SMC 압축성형공정의 3차원 유한요소 해석 = Three dimensional finite element analysis of compression molding of sheet molding compoundlink

김수영; Kim, Soo-Young; et al, 한국과학기술원, 1995

5
Three-dimensional finite-element analysis of the compression molding of sheet molding compound

Kim, Soo-Young; Im, Yong-Taek, Journal of Materials Processing Technology, Vol.67, No.1-3, pp.207-213, 1997-05

6
Three-dimensional finite-element analysis of the compression molding of sheet molding compound

Kim, Soo-Young; Im, Yong-Taek, Journal of Materials Processing Technology, Vol.67, No.1, pp.207-213, 1997-05

7
강열점소성 유한요소법을 이용한 3차원 성형 공정 해석에서의 접촉 처리 및 병렬 처리를 위한 연구 = Three-dimensional contact treatment and parallel processing of thermo-rigid-viscoplastic finite element analysis of forming processlink

김수영; Kim, Soo-Young; et al, 한국과학기술원, 2000

8
발견적 일정 계획 기법을 이용한 수주 생산체제에서의 자원 제약하의 일정 계획 = Resource-constrained scheduling in the job shop using project scheduling heuristic algorithmlink

김수영; Kim, Soo-Young; et al, 한국과학기술원, 1981

rss_1.0 rss_2.0 atom_1.0