Showing results 1 to 4 of 4
A Newly Developed State-of-the-Art Full-Scale Excavation Testing Apparatus for Tunnel Boring Machine (TBM) Lee, Gi-Jun; Ryu, Hee-Hwan; Kwon, Tae-Hyuk; Cho, Gye-Chun; Kim, Kyoung-Yul; Hong, Sungyun, KSCE JOURNAL OF CIVIL ENGINEERING, v.25, no.12, pp.4856 - 4867, 2021-12 |
Full-scale TBM excavation tests for rock-like materials with different uniaxial compressive strength Lee, Gi-Jun; Ryu, Hee-Hwan; Cho, Gye-Chun; Kwon, Tae-Hyuk, GEOMECHANICS AND ENGINEERING, v.35, no.5, pp.487 - 497, 2023-12 |
TBM 주변 지반상태예측을 위한 전기비저항 이론식 유도 및 검증 홍창호; 이민형; 조계춘, 한국터널지하공간학회 논문집, v.22, no.1, pp.135 - 144, 2020-01 |
경암의 취성도와 TBM 순굴진율간의 관계 이기준; 권태혁; 김경열; 송기일, 한국터널지하공간학회 논문집, v.19, no.4, pp.611 - 634, 2017-07 |
Discover