Optimal Scheduling in Power-Generation Systems with Thermal and Pumped-Storage Hydroelectric Units

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 271
  • Download : 220
This paper is concerned with the unit commitment problem in an electric power system with both thermal and pumed-storage hydroelectric units. This is a mixed integer programming problem and the Lagrangean relaxation method is used. We show that the relaxed problem decomposes into two kinds of subproblems: a shortest-path problem for each thermal unit and a minimum cost flow problem for each pumped-storage hydroelectric unit. A method of obtaining an incumbent solution from the solution of a relaxed problem is presented. The Lagrangean multipliers are updated using both subgradient and incremental cost. The algorithm is applied to a real Korean power generation system and its computational results are reported and compaired with other works.
Publisher
한국경영과학회
Issue Date
1990-06
Language
English
Citation

한국경영과학회지, v.15, no.1

ISSN
1225-1119
URI
http://hdl.handle.net/10203/11876
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0