Browse by Subject underground

Showing results 1 to 4 of 4

1
Development of the trenchless rehabilitation process for underground pipes based on RTM

Chin, WS; Lee, Dai Gil, COMPOSITE STRUCTURES, v.68, no.3, pp.267 - 283, 2005-05

2
Optimization of a pre-improvement support system for large underground excavation

Song, Ki-Il; Cho, Gye-Chun; Sim, Young-Jong; Lee, In-Mo, Tunnelling and Underground Space Technology Journal v. 21 Issue 3-4 pp.374-374, 2006-05

3
Repair of underground buried pipes with resin transfer molding

Lee, Dai Gil; Chin, WS; Kwon, JW; Yoo, AK, COMPOSITE STRUCTURES, v.57, no.1-4, pp.67 - 77, 2002-07

4
Trenchless repairing of underground pipes using RTM based on the axiomatic design method

Chin, WS; Kwon, JW; Lee, Dai Gil, JOURNAL OF COMPOSITE MATERIALS, v.37, no.12, pp.1109 - 1126, 2003

rss_1.0 rss_2.0 atom_1.0