Showing results 1 to 19 of 19
A visualized human-computer interactive approach to job shop scheduling Baek, DH; Oh, SY; Yoon, Wan Chul, INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.12, no.1, pp.75 - 83, 1999 |
Coordinating decisions by supply chain partners in a vendor-managed inventory relationship Kim, Bo-Won; Park, Chul-Soon, JOURNAL OF MANUFACTURING SYSTEMS, v.29, no.2-3, pp.71 - 80, 2010-07 |
Deadlock Avoidance in Sequential Resource Allocation Systems with Multiple Resource Acquisitions and Flexible Routings j. park; s. reveliotis, IEEE TRANSACTIONS ON AUTOMATIC CONTROL, v.46, no.10, pp.1572 - 1583, 2001 |
Deterministic Flow Lines With Applications Morrison, James R, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.7, pp.228 - 239, 2010-04 |
Exit Recursion Models of Clustered Photolithography Tools for Fab Level Simulation Park, Jung Yeon; Park, Kyungsu; Morrison, James R., IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.1, pp.39 - 51, 2017-02 |
Generating interpretable fuzzy rules for adaptive job dispatching Lee, KK; Yoon, Wan Chul; Baek, DH, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.39, no.5, pp.1011 - 1030, 2001-03 |
Innovative products and services for sustainable societal development: Current reality, future potential and challenges Kantola, J.; Liu, Y.; Peura, P.; de Leeuw, T.; Zhang, Y.; Naaranoja, M.; Segev, Aviv; et al, JOURNAL OF CLEANER PRODUCTION, v.162, pp.S1 - S10, 2017-09 |
Modeling and implementing a real-time scheduler for dual-armed cluster tools Shin, YH; Lee, Tae-Eog; Kim, JH; Lee, HY, COMPUTERS IN INDUSTRY, v.45, no.1, pp.13 - 27, 2001-05 |
Models of Clustered Photolithography Tools for Fab-Level Simulation: From Affine to Flow Line Park, Jung Yeon; Park, Kyungsu; Morrison, James R., IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.4, pp.547 - 558, 2017-11 |
Multiagent supervisory control for antifault propagation in serial production systems Cho, Kwang-Hyun; Lim, Jong-Tae, IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, v.48, no.2, pp.460 - 466, 2001-04 |
Multiple criteria clustering algorithm for solving the group technology problem with multiple process routings Won, Y; Kim, Sehun, COMPUTERS INDUSTRIAL ENGINEERING, v.32, no.1, pp.207 - 220, 1997-01 |
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04 |
Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter Hwang, Hark, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.40, no.4, pp.873 - 883, 2002-01 |
Petri net modeling and scheduling for cyclic job shops with blocking Song, JS; Lee, Tae-Eog, COMPUTERS & INDUSTRIAL ENGINEERING, v.34, no.2, pp.281 - 295, 1998-04 |
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07 |
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure Kim, JU; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.23, no.9, pp.857 - 868, 1996-09 |
Simulation-based optimization for design parameter exploration in hybrid system: a defense system example Hong, Jeong-Hee; Seo, Kyung-Min; Kim, Tag-Gon, SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, v.89, no.3, pp.362 - 380, 2013-03 |
Tool replacement policies for a machining centre producing multiple types of products with distinct due dates Choi, Yong-Chan; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.39, no.5, pp.907 - 921, 2001-03 |
Two-stage Procedure for the Cell Formation Problem with Alternative Part Processing Routes Hwang, Hark, ENGINEERING OPTIMIZATION, v.26, no.3, pp.159 - 170, 1996-01 |
Discover